Skip to main content
Colorado General AssemblyToggle Main Menu
Agency NameToggle Agency Menu

Red Book 2024

This tabulation indicates all changes made by amendments, additions, and repeals to Colorado Revised Statutes by the Seventy-fourth General Assembly at its Second Regular Session in 2024. These changes will appear in the 2024 Colorado Revised Statutes.

Final Version - last updated 7/2/2024 11:27 a.m. MDT

Jump to Red Book 2024B

Explanation of Symbols
C.R.S. Colorado Revised Statutes section number
A Amended
IP Introductory portion of a section,
subsection, paragraph, or subparagraph
N New
NC No change in existing law
R Repealed
RE Repealed and reenacted
RC Recreated and reenacted

 

Changes by C.R.S. Section Number
TITLE 1            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
3 1-1-107 (8) N S-24-072 298 1 05/31/2024
  1-1-110 (3.5) N S-24-210 468 1 06/06/2024
  1-1-111 IP(1) A S-24-210 468 59 06/06/2024
  1-1-111 (2) A S-24-210 468 59 06/06/2024
2, 4 1-1-116 N H-24-1067 51 2 08/07/2024
  1-2-101 (2)(a)(I) A S-24-210 468 2 01/01/2025
  1-2-202.5 (3)(a)(I) A S-24-210 468 3 01/01/2025
  1-2-205 (2) A S-24-210 468 4 01/01/2025
  1-2-402 (3) A S-24-210 468 5 01/01/2025
  1-3-103 (5)(a) A S-24-210 468 6 06/06/2024
  1-3-103 (6)(a) A S-24-210 468 6 06/06/2024
  1-4-101 (6) N S-24-210 468 53 03/01/2026
  1-4-105 A S-24-210 468 7 06/06/2024
  1-4-304 (1) A S-24-210 468 8 06/06/2024
  1-4-304 (2) A S-24-210 468 8 06/06/2024
  1-4-403 (2) A S-24-210 468 9 06/06/2024
2, 4 1-4-801 (5)(a) A H-24-1067 51 3 08/07/2024
75 1-4-802 (1)(d) A S-24-210 468 10 06/06/2024
75 1-4-802 (1)(f) A S-24-210 468 10 06/06/2024
  1-4-802 (1)(g)(II) A S-24-210 468 10 06/06/2024
  1-4-905.7 N S-24-210 468 11 01/01/2025
  1-4-908 (1.5)(b)(I) A S-24-210 468 12 06/06/2024
  1-4-908 (1.5)(b)(II) A S-24-210 468 12 06/06/2024
  1-5-102.9 IP(1)(a)(III) A S-24-210 468 13 06/06/2024
  1-5-102.9 (1)(a)(V) N S-24-210 468 13 06/06/2024
  1-5-102.9 (1)(b.5)(V)(B) R S-24-210 468 13 06/06/2024
  1-5-102.9 (5)(b) A S-24-210 468 13 06/06/2024
  1-5-402 IP(1) A S-24-210 468 14 06/06/2024
  1-5-402 (1)(a) A S-24-210 468 14 06/06/2024
  1-5-408 R S-24-210 468 15 06/06/2024
  1-5-610 A S-24-210 468 16 06/06/2024
  1-5-617 (4) A S-24-210 468 17 06/06/2024
  1-5-620 R S-24-210 468 18 06/06/2024
  1-5-623 (1) R S-24-210 468 19 06/06/2024
  1-5-623 (2) R S-24-210 468 19 06/06/2024
  1-5-623 (3) A S-24-210 468 19 06/06/2024
3 1-5-703 (2) A S-24-072 298 2 05/31/2024
  1-5-704 IP(1) A S-24-210 468 20 06/06/2024
  1-5-704 (1)(h) A S-24-210 468 20 06/06/2024
  1-5-705 A S-24-210 468 21 06/06/2024
  1-6-103 (1)(a) A S-24-210 468 22 06/06/2024
  1-6-103 (2) A S-24-210 468 22 06/06/2024
  1-6-119 (1) A S-24-210 468 23 06/06/2024
  1-7-110 (6) N S-24-210 468 24 06/06/2024
  1-7-118 (5) A S-24-210 468 25 06/06/2024
  1-7-201 (1) A S-24-210 468 26 06/06/2024
  1-7-401 A S-24-210 468 27 06/06/2024
  1-7-402 R S-24-210 468 28 06/06/2024
  1-7-405 R S-24-210 468 29 06/06/2024
  1-7-406 R S-24-210 468 30 06/06/2024
  1-7-407 R S-24-210 468 31 06/06/2024
  1-7-503 R S-24-210 468 32 06/06/2024
  1-7-505 R S-24-210 468 33 06/06/2024
  1-7-507 (5) R S-24-210 468 34 06/06/2024
  1-7-512 (1)(a) A S-24-210 468 35 06/06/2024
  1-7-512 (1)(b) A S-24-210 468 35 06/06/2024
  1-7-514 (1)(a)(I) A S-24-210 468 36 06/06/2024
  1-7-514 (6) N S-24-210 468 36 06/06/2024
  1-7-515 (4)(b) A S-24-210 468 37 06/06/2024
  1-7-1002 (1) A S-24-210 468 54 03/01/2026
  1-7-1002 (2.5) N S-24-210 468 54 03/01/2026
  1-7.5-107 (3)(a)(I) A S-24-210 468 38 06/06/2024
  1-7.5-107 (4.3)(c)(III) N S-24-210 468 38 06/06/2024
4 1-7.5-107.3 (1.5)(d)(I) A H-24-1450 490 1 08/07/2024
4 1-7.5-107.3 (2)(d)(I) A H-24-1450 490 1 08/07/2024
3 1-7.5-113.5 A S-24-072 298 3 05/31/2024
  1-7.5-115 (1)(a) RE S-24-210 468 39 06/06/2024
  1-7.5-115 (1)(b) A S-24-210 468 39 06/06/2024
  1-7.5-205 (2)(c) R S-24-210 468 40 06/06/2024
  1-10.5-104 R S-24-210 468 41 06/06/2024
  1-10.5-109 (1) A S-24-210 468 42 06/06/2024
  1-11-104 A S-24-210 468 43 06/06/2024
  1-11-106 A S-24-210 468 44 06/06/2024
  1-11-204 A S-24-210 468 45 06/06/2024
  1-12-117 (1) A S-24-210 468 46 06/06/2024
2, 3 1-13-724 (1)(a)(III) A S-24-131 301 4 07/01/2024
2, 3 1-13-724 (1)(b)(I) A S-24-131 301 4 07/01/2024
2, 3 1-13-724 (3)(a) A S-24-131 301 4 07/01/2024
2, 3 1-13-724 (3)(b) A S-24-131 301 4 07/01/2024
2, 3 1-13-724 (3)(c) A S-24-131 301 4 07/01/2024
3 1-13-725 N H-24-1150 115 1 07/01/2024
  1-40-121 (2)(b) R S-24-210 468 47 06/06/2024
  1-40-136 R S-24-210 468 48 06/06/2024
  1-45-103.7 (5.7) N S-24-210 468 49 06/06/2024
  1-45-110 (2.5) A S-24-210 468 50 06/06/2024
  1-45-110 (3.5) A S-24-210 468 50 06/06/2024
  1-45-110 (4) A S-24-210 468 50 06/06/2024
3 1-45-111.5 (1.5)(c.5) N H-24-1147 250 1 07/01/2024
3 1-45-111.7 (2)(a) A H-24-1147 250 2 07/01/2024
3, 4 1-45-111.7 (9)(b) R H-24-1283 338 1 08/07/2024
3, 4, 162 1-45-111.7 (10) N H-24-1283 338 1 08/07/2024
3 1-46- (entire article 46) N H-24-1147 250 3 07/01/2024
TITLE 2            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
2, 4 2-2-307 (1)(b) A H-24-1059 377 4 08/07/2024
2, 4 2-2-307 IP(3)(a) A H-24-1059 377 4 08/07/2024
2, 4 2-2-307 (6) N H-24-1059 377 4 08/07/2024
2, 4 2-2-317 IP(1)(a) A H-24-1059 377 2 08/07/2024
2, 4 2-2-317 IP(1)(b)(II) A H-24-1059 377 2 08/07/2024
2, 4 2-2-317 (1)(b)(II)(A) A H-24-1059 377 2 08/07/2024
2, 4 2-2-317 (1)(b.5) N H-24-1059 377 2 08/07/2024
2, 4 2-2-317 (1)(c)(II) A H-24-1059 377 2 08/07/2024
2, 4 2-2-317 (2)(a) A H-24-1059 377 2 08/07/2024
2, 4 2-2-317 (2)(b) A H-24-1059 377 2 08/07/2024
4 2-2-2103 (1)(b)(I) A H-24-1450 490 2 08/07/2024
4 2-2-23 (entire part 23) N S-24-053 368 1 08/07/2024
4, 16 2-3-103.7 (1) A H-24-1450 490 3 08/07/2024
4 2-3-107 (2)(a)(I)(F) A H-24-1450 490 4 08/07/2024
  2-3-128 (1)(d) A H-24-1346 216 13 05/21/2024
  2-3-129 N H-24-1417 136 1 07/01/2024
  2-3-130 N H-24-1462 357 1 06/03/2024
3, 4 2-3-203 (4) A H-24-1428 89 1 08/07/2024
3, 4 2-3-204 (3) A H-24-1428 89 2 08/07/2024
4 2-3-208 (3)(b)(I) A H-24-1385 90 1 08/07/2024
  2-3-208 (6) N S-24-217 308 2 05/31/2024
3, 4 2-3-210 (1) A H-24-1428 89 3 08/07/2024
3, 4 2-3-210 IP(2) A H-24-1428 89 3 08/07/2024
3, 4 2-3-210 (2)(a) A H-24-1428 89 3 08/07/2024
3, 4 2-3-210 (2)(b) R H-24-1428 89 3 08/07/2024
3, 4 2-3-210 (2)(c) A H-24-1428 89 3 08/07/2024
3, 4 2-3-210 (2)(d) A H-24-1428 89 3 08/07/2024
3, 4 2-3-210 (2)(f) R H-24-1428 89 3 08/07/2024
3, 4 2-3-210 (3) A H-24-1428 89 3 08/07/2024
3, 4 2-3-210 (4) R H-24-1428 89 3 08/07/2024
3, 4 2-3-210 (5) R H-24-1428 89 3 08/07/2024
3, 4 2-3-210 (6) N H-24-1428 89 3 08/07/2024
  2-3-303 (3)(i) N S-24-157 23 3 03/12/2024
4 2-3-511 (2.5) N S-24-160 445 1 08/07/2024
4 2-3-511 (3) A S-24-160 445 1 08/07/2024
4 2-3-511 (3.5) N S-24-160 445 1 08/07/2024
4 2-3-901 (2) A H-24-1450 490 5 08/07/2024
4 2-3-901 (5) A H-24-1450 490 5 08/07/2024
4 2-3-1203 (14)(a)(VII) R H-24-1450 490 6 08/07/2024
4 2-3-1203 (15)(a)(II) R H-24-1257 116 1 08/07/2024
3, 4 2-3-1203 (15)(a)(III) R H-24-1252 315 1 08/07/2024
4 2-3-1203 (15)(a)(IV) R H-24-1256 201 1 08/07/2024
4 2-3-1203 (15)(a)(V) R H-24-1277 118 2 08/07/2024
29 2-3-1203 (15)(a)(VI) R H-24-1278 337 1 09/01/2024
4 2-3-1203 (15)(a)(VII) R H-24-1255 392 1 08/07/2024
  2-3-1203 (15)(a)(VIII) R H-24-1345 317 1 05/31/2024
4 2-3-1203 (15)(a)(IX) R H-24-1272 416 2 08/07/2024
3, 15 2-3-1203 (17)(a)(V) R H-24-1269 394 8 07/01/2025
  2-3-1203 (18.5)(a)(III) A H-24-1468 467 3 06/06/2024
29 2-3-1203 (18.5)(a)(IV) N H-24-1278 337 1 09/01/2024
  2-3-1203 (20)(a)(V) N H-24-1211 7 2 02/27/2024
4 2-3-1203 (20)(a)(VI) N H-24-1256 201 1 08/07/2024
15 2-3-1203 (20)(a)(VII) N H-24-1399 76 6 07/01/2025
3, 15 2-3-1203 (20)(a)(VIII) N H-24-1269 394 8 07/01/2025
4 2-3-1203 (20)(a)(IX) N S-24-055 469 3 08/07/2024
4 2-3-1203 (21) N H-24-1255 392 1 08/07/2024
  2-3-1203 (22)(a)(VI) N H-24-1345 317 1 05/31/2024
  2-3-1203 (24) N H-24-1054 328 4 06/03/2024
4 2-3-1203 (24.5) N H-24-1272 416 3 08/07/2024
4 2-3-1203 (25)(a)(III) N H-24-1257 116 1 08/07/2024
4 2-3-1203 (25)(a)(IV) N H-24-1277 118 2 08/07/2024
3, 4 2-3-1203 (25)(a)(V) N H-24-1252 315 1 08/07/2024
  2-3-1203 (25)(a)(VI) N H-24-1030 161 2 07/01/2024
  2-3-1203 (25)(a)(VII) N H-24-1030 161 2 07/01/2024
4 2-3-1304 (3) R S-24-178 108 1 08/07/2024
  2-3-1701 (1) A H-24-1468 467 1 06/06/2024
  2-3-1701 (12) A H-24-1468 467 1 06/06/2024
141 2-3-1707 RE H-24-1468 467 2 06/06/2024
  2-3-1901 (1)(b)(I) A H-24-1054 328 1 06/03/2024
  2-3-1901 (1)(b)(II) A H-24-1054 328 1 06/03/2024
  2-3-1901 (2)(e) N H-24-1054 328 1 06/03/2024
  2-3-1901 (2)(f) N H-24-1054 328 1 06/03/2024
  2-3-1901 (3) N H-24-1054 328 1 06/03/2024
  2-3-1901.5 N H-24-1054 328 2 06/03/2024
  2-3-1902 R H-24-1054 328 3 06/03/2024
  2-3-1903 R H-24-1054 328 3 06/03/2024
  2-3-1904 R H-24-1054 328 3 06/03/2024
  2-3-20 (entire part 20) N H-24-1368 271 1 05/28/2024
  2-5-126 (2)(aa) N H-24-1020 3 1 02/20/2024
4 2-7-202 (1.5) R H-24-1450 490 7 08/07/2024
4 2-7-203 (2)(d) R H-24-1450 490 8 08/07/2024
TITLE 3            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
  3-3-106 N S-24-074 39 1 04/04/2024
TITLE 5            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
4 5-1-301 (11)(a.5) N H-24-1324 316 1 08/07/2024
4 5-1-301 (15)(a.5) N H-24-1324 316 1 08/07/2024
4 5-2-202 (1)(c.7) A H-24-1450 490 9 08/07/2024
4 5-16-103 (8)(a.5) N H-24-1324 316 2 08/07/2024
41 5-16-111 (1.5) N H-24-1380 463 1 08/07/2024
41 5-19-110 (3) N H-24-1380 463 2 08/07/2024
41 5-19-110 (4) N H-24-1380 463 2 08/07/2024
41 5-19-110 (5) N H-24-1380 463 2 08/07/2024
41 5-19-110 (6) N H-24-1380 463 2 08/07/2024
41 5-19-110 (7) N H-24-1380 463 2 08/07/2024
4 5-19-217 (b)(1) A H-24-1251 226 3 08/07/2024
41 5-19-217 (b)(3)(A) A H-24-1380 463 3 08/07/2024
41 5-19-217 (c)(3) A H-24-1380 463 3 08/07/2024
41 5-19-218 (b) A H-24-1380 463 4 08/07/2024
41 5-19-223 (d)(2)(A)(iii) A H-24-1380 463 5 03/01/2025
41 5-19-223 (d)(2)(C) N H-24-1380 463 5 08/07/2024
41 5-19-223 (d)(4) R H-24-1380 463 5 03/01/2025
41 5-19-223 (e) R H-24-1380 463 5 03/01/2025
4 5-19-228 (a)(2) A H-24-1251 226 4 08/07/2024
4 5-19-232 (e) A H-24-1251 226 5 08/07/2024
4 5-19-242 A H-24-1251 226 2 08/07/2024
4 5-20-202 (4) A H-24-1324 316 3 08/07/2024
4 5-20-202 (5) A H-24-1324 316 3 08/07/2024
4 5-20-203 (8) N H-24-1324 316 4 08/07/2024
  5-21-107.5 N H-24-1011 189 3 05/17/2024
TITLE 6            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
  6-1-102 (10) A H-24-1356 346 1 06/03/2024
2, 3, 4, 57 6-1-105 (1)(cccc) A S-24-011 402 3 08/07/2024
57 6-1-105 (1)(cccc) A H-24-1356 346 2 06/03/2024
3, 4 6-1-105 (1)(eeee) N H-24-1051 292 7 08/07/2024
  6-1-105 (1)(ffff) N H-24-1438 351 1 06/03/2024
2, 3, 4 6-1-105 (1)(gggg) N S-24-011 402 3 08/07/2024
  6-1-105 (1)(hhhh) N S-24-205 198 2 05/17/2024
  6-1-105 (4) A H-24-1356 346 2 06/03/2024
31 6-1-707 (1)(f) N H-24-1174 388 8 08/07/2024
3 6-1-718 IP(1) A H-24-1378 400 1 08/07/2024
3 6-1-718 (1)(c) A H-24-1378 400 1 08/07/2024
3 6-1-718 (2) A H-24-1378 400 1 08/07/2024
3 6-1-718 (3)(b) A H-24-1378 400 1 08/07/2024
3 6-1-718 (4) A H-24-1378 400 1 08/07/2024
3 6-1-718 (5) A H-24-1378 400 1 08/07/2024
3 6-1-720 IP(1) A H-24-1378 400 2 08/07/2024
3 6-1-720 (1)(a) A H-24-1378 400 2 08/07/2024
3 6-1-720 (1)(c) N H-24-1378 400 2 08/07/2024
3 6-1-720 (1)(d) N H-24-1378 400 2 08/07/2024
3 6-1-720 (1)(e) N H-24-1378 400 2 08/07/2024
3 6-1-720 (1)(f) N H-24-1378 400 2 08/07/2024
3 6-1-720 (1)(g) N H-24-1378 400 2 08/07/2024
3 6-1-720 (1)(h) N H-24-1378 400 2 08/07/2024
3 6-1-720 (1)(i) N H-24-1378 400 2 08/07/2024
3 6-1-720 (2) A H-24-1378 400 2 08/07/2024
3 6-1-720 (2.5) N H-24-1378 400 2 08/07/2024
2, 3, 4 6-1-731.5 N S-24-011 402 2 08/07/2024
  6-1-735 N H-24-1259 415 1 06/05/2024
4 6-1-736 N S-24-113 196 4 08/07/2024
  6-1-1215 N H-24-1161 322 1 06/03/2024
3, 89 6-1-1302 (1)(a)(III) A S-24-041 296 1 10/01/2025
3, 89 6-1-1302 (1)(a)(V) A S-24-041 296 1 10/01/2025
3, 89 6-1-1302 (1)(b)(II) A S-24-041 296 1 10/01/2025
3, 89 6-1-1302 (1)(c)(I) A S-24-041 296 1 10/01/2025
3, 89 6-1-1302 (1)(c)(II)(A.5) N S-24-041 296 1 10/01/2025
3, 89 6-1-1303 (1) A S-24-041 296 2 10/01/2025
3, 89 6-1-1303 (1.5) N S-24-041 296 2 10/01/2025
2, 3, 15, 164 6-1-1303 (2.2) N H-24-1130 313 3 07/01/2025
2, 3, 15, 164 6-1-1303 (2.4) N H-24-1130 313 3 07/01/2025
2, 3, 4, 164 6-1-1303 (2.5) N H-24-1058 68 2 08/07/2024
3, 89 6-1-1303 (14.5) N S-24-041 296 2 10/01/2025
3, 89 6-1-1303 (16.5) N S-24-041 296 2 10/01/2025
2, 3, 4 6-1-1303 (16.7) N H-24-1058 68 2 08/07/2024
3, 89 6-1-1303 (16.8) N S-24-041 296 2 10/01/2025
3, 89 6-1-1303 (17.5) N S-24-041 296 2 10/01/2025
2, 3, 4 6-1-1303 (24)(b) A H-24-1058 68 2 08/07/2024
2, 3, 4 6-1-1303 (24)(c) A H-24-1058 68 2 08/07/2024
2, 3, 4 6-1-1303 (24)(d) N H-24-1058 68 2 08/07/2024
2, 3, 15, 96 6-1-1304 (1) A H-24-1130 313 4 07/01/2025
3, 89, 96 6-1-1304 (1) A S-24-041 296 3 10/01/2025
3, 89 6-1-1304 (3)(d) A S-24-041 296 3 10/01/2025
3, 89 6-1-1304 (3)(e) A S-24-041 296 3 10/01/2025
3, 89 6-1-1304 (3)(f) N S-24-041 296 3 10/01/2025
3, 89 6-1-1304 (3)(g) N S-24-041 296 3 10/01/2025
3, 89 6-1-1305.5 N S-24-041 296 4 10/01/2025
3, 89 6-1-1308.5 N S-24-041 296 4 10/01/2025
3, 89 6-1-1309.5 N S-24-041 296 4 10/01/2025
3, 89 6-1-1311 (1)(d) A S-24-041 296 5 10/01/2025
2, 3, 15 6-1-1314 N H-24-1130 313 2 07/01/2025
33 6-1-1502 (1)(b) A H-24-1121 258 1 01/01/2026
33 6-1-1502 (1.1) N H-24-1121 258 1 01/01/2026
33 6-1-1502 (1.7) N H-24-1121 258 1 01/01/2026
33 6-1-1502 (4) R H-24-1121 258 1 01/01/2026
33 6-1-1502 (4.3) R H-24-1121 258 1 01/01/2026
33 6-1-1502 IP(5) N H-24-1121 258 1 01/01/2026
33 6-1-1502 (5)(a)(I) A H-24-1121 258 1 01/01/2026
33 6-1-1502 (5)(b) A H-24-1121 258 1 01/01/2026
33 6-1-1502 IP(5)(c) A H-24-1121 258 1 01/01/2026
33 6-1-1502 IP(5)(d) A H-24-1121 258 1 01/01/2026
33 6-1-1502 IP(5)(e) A H-24-1121 258 1 01/01/2026
33 6-1-1502 (5.5) N H-24-1121 258 1 01/01/2026
33 6-1-1502 (7.2) N H-24-1121 258 1 01/01/2026
33 6-1-1502 (7.3) N H-24-1121 258 1 01/01/2026
33 6-1-1502 (7.5) N H-24-1121 258 1 01/01/2026
33 6-1-1502 (7.7) N H-24-1121 258 1 01/01/2026
33 6-1-1502 (7.8) N H-24-1121 258 1 01/01/2026
33 6-1-1502 (8) A H-24-1121 258 1 01/01/2026
33 6-1-1502 (9) A H-24-1121 258 1 01/01/2026
33 6-1-1502 (10.3) N H-24-1121 258 1 01/01/2026
33 6-1-1502 (12) A H-24-1121 258 1 01/01/2026
33 6-1-1502 (15) N H-24-1121 258 1 01/01/2026
33 6-1-1503 (1) A H-24-1121 258 2 01/01/2026
33 6-1-1503 (2)(a)(II) A H-24-1121 258 2 01/01/2026
33 6-1-1503 IP(3) A H-24-1121 258 2 01/01/2026
33 6-1-1503 (3)(a) A H-24-1121 258 2 01/01/2026
33 6-1-1503 (3)(c) A H-24-1121 258 2 01/01/2026
33 6-1-1503 (5) N H-24-1121 258 2 01/01/2026
33 6-1-1503 (6) N H-24-1121 258 2 01/01/2026
33 6-1-1503 (7) N H-24-1121 258 2 01/01/2026
33 6-1-1503 (8) N H-24-1121 258 2 01/01/2026
33 6-1-1503 (9) N H-24-1121 258 2 01/01/2026
33 6-1-1503 (10) N H-24-1121 258 2 01/01/2026
2, 4 6-1-16 (entire part 16) N H-24-1136 460 4 08/07/2024
  6-1-17 (entire part 17) N S-24-205 198 1 05/17/2024
  6-7.5-105 (5)(j) A S-24-214 191 4 05/17/2024
  6-7.7- (entire article 7.7) N S-24-214 191 3 05/17/2024
15 6-20-102 (1)(n) A H-24-1399 76 8 07/01/2025
15 6-20-203 IP(4) A H-24-1399 76 9 07/01/2025
15 6-20-203 (5)(b) A H-24-1399 76 9 07/01/2025
15 6-20-203 (5)(c) A H-24-1399 76 9 07/01/2025
29 6-26-101 (1) A H-24-1336 219 4 09/01/2024
29 6-26-101 (3) A H-24-1336 219 4 09/01/2024
4 6-27-101 A S-24-066 141 4 08/07/2024
4 6-27-103 IP A S-24-066 141 5 08/07/2024
4 6-27-105 (1) A S-24-066 141 6 08/07/2024
4 6-27-105 (2) A S-24-066 141 6 08/07/2024
4 6-27-105 (3)(a) A S-24-066 141 6 08/07/2024
4 6-27-105 (3)(d) A S-24-066 141 6 08/07/2024
4 6-27-105 (4) A S-24-066 141 6 08/07/2024
4 6-27-106 A S-24-066 141 7 08/07/2024
4 6-27-2 (entire part 2) N S-24-066 141 1 08/07/2024
TITLE 7            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
3, 4 7-90-102 (36.5) N S-24-129 272 1 08/07/2024
3, 4 7-90-102 (53.5) N S-24-129 272 1 08/07/2024
3, 4 7-90-102 (56) A H-24-1137 332 1 08/07/2024
3, 4 7-90-102 (62) A H-24-1137 332 1 08/07/2024
3, 4 7-90-107 N S-24-129 272 2 08/07/2024
3, 4, 142 7-90-301.5 A H-24-1137 332 2 08/07/2024
3, 4 7-90-314 IP(2) A H-24-1137 332 3 08/07/2024
3, 4 7-90-314 (4)(f) A H-24-1137 332 3 08/07/2024
3, 4 7-90-314 (4)(g)(IV)(A) A H-24-1137 332 3 08/07/2024
3, 4 7-90-314 IP(4)(g)(V) A H-24-1137 332 3 08/07/2024
3, 4 7-90-314 (4)(g)(V)(A) A H-24-1137 332 3 08/07/2024
3, 4 7-90-701 (1) A H-24-1137 332 4 08/07/2024
3, 4 7-90-701 (2) A H-24-1137 332 4 08/07/2024
3, 4 7-90-701 (4) N H-24-1137 332 4 08/07/2024
3, 4 7-90-901 (1)(b) A H-24-1137 332 5 08/07/2024
3, 4 7-90-901 (1)(c) A H-24-1137 332 5 08/07/2024
3, 4 7-90-901 (1)(d) N H-24-1137 332 5 08/07/2024
3, 4 7-90-901 (2)(d) A H-24-1137 332 5 08/07/2024
3, 4 7-90-901 (2)(e) A H-24-1137 332 5 08/07/2024
3, 4 7-90-901 (2)(f) N H-24-1137 332 5 08/07/2024
3, 4 7-90-902 (1) A H-24-1137 332 6 08/07/2024
3, 4 7-90-904 (1) A H-24-1137 332 7 08/07/2024
3, 4 7-90-1003 IP(1) A H-24-1137 332 8 08/07/2024
3, 4 7-90-1003 (1)(d) R H-24-1137 332 8 08/07/2024
3, 4 7-90-1003 (1.5) N H-24-1137 332 8 08/07/2024
TITLE 8            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
2 8-1-103 (2) A H-24-1467 430 4 06/05/2024
  8-1-103 (4) N H-24-1364 238 4 05/23/2024
4 8-2-113 (3)(a) A H-24-1324 316 5 08/07/2024
4 8-2-113 (8)(a) A H-24-1324 316 5 08/07/2024
4 8-2-113 (8)(b) A H-24-1324 316 5 08/07/2024
4 8-2-113 (8)(d) N H-24-1324 316 5 08/07/2024
4 8-2-113 (9) N H-24-1324 316 5 08/07/2024
  8-2-132 N H-24-1132 331 3 06/03/2024
  8-3.3-114 (6)(b) A H-24-1219 282 6 05/29/2024
  8-3.7-103 (2)(l) N H-24-1364 238 5 05/23/2024
4 8-3.7-107 (1)(a) A S-24-103 32 1 08/07/2024
4 8-3.7-2 (entire part 2) N H-24-1280 437 1 08/07/2024
4 8-3.8-101 (3)(b) A S-24-103 32 2 08/07/2024
3 8-4-113 (3)(a) A H-24-1095 378 4 01/01/2025
3 8-4-113 IP(4)(a) A H-24-1095 378 4 01/01/2025
3 8-4-113 (5)(a) A H-24-1095 378 4 01/01/2025
3 8-4-120 (1)(a) A H-24-1095 378 5 01/01/2025
3, 54 8-4-126 N H-24-1129 383 1 08/07/2024
4 8-4-127 N S-24-075 409 1 08/07/2024
3 8-6-111 (2) A H-24-1095 378 6 01/01/2025
3 8-12-115 (3) A H-24-1095 378 1 01/01/2025
3 8-12-115 (4) A H-24-1095 378 1 01/01/2025
3 8-12-115 (4.5) N H-24-1095 378 1 01/01/2025
3 8-12-115 (5.5) N H-24-1095 378 1 01/01/2025
3 8-12-115 (8) N H-24-1095 378 1 01/01/2025
3 8-12-116 A H-24-1095 378 2 01/01/2025
3 8-12-118 N H-24-1095 378 3 01/01/2025
2, 4 8-13.3-503 (6) A H-24-1350 344 9 08/07/2024
  8-13.3-518 (4)(a.5) N H-24-1465 257 1 05/24/2024
  8-13.3-518 (4)(d)(III) A H-24-1465 257 1 05/24/2024
4 8-14.3-203 (4)(a)(I) A H-24-1450 490 10 08/07/2024
4 8-14.3-203 (4)(d)(VI) A H-24-1450 490 10 08/07/2024
  8-14.3-204 A S-24-109 442 1 06/06/2024
  8-14.3-205 A S-24-109 442 2 06/06/2024
4 8-15.7-101 (14) A S-24-103 32 3 08/07/2024
2, 4 8-15.7-101 (18) N S-24-104 299 2 08/07/2024
  8-15.7-102 (1)(s) N H-24-1439 163 3 05/10/2024
  8-15.7-102 (6) N H-24-1364 238 6 05/23/2024
4 8-15.7-103 IP(2)(a) A S-24-103 32 4 08/07/2024
4 8-15.7-103 IP(2)(a)(II) A S-24-103 32 4 08/07/2024
4 8-15.7-104 IP(2)(a) A S-24-103 32 5 08/07/2024
4 8-15.7-104 (2)(a)(II) A S-24-103 32 5 08/07/2024
2, 4 8-15.7-2 (entire part 2) N S-24-104 299 3 08/07/2024
  8-15.7-3 (entire part 3) N H-24-1439 163 4 05/10/2024
  8-15.7-4 (entire part 4) N H-24-1439 163 4 05/10/2024
4 8-15.8-102 (3) A H-24-1450 490 11 08/07/2024
  8-15.8-103 (4) N H-24-1364 238 7 05/23/2024
4 8-20-206.5 IP(1)(b) A S-24-105 42 1 08/07/2024
4 8-20-206.5 (1)(c) A S-24-105 42 1 08/07/2024
4 8-20-206.5 (6)(b) A S-24-105 42 1 08/07/2024
4 8-20-206.5 (6)(c) R S-24-105 42 1 08/07/2024
4 8-20-206.5 (6)(d) R S-24-105 42 1 08/07/2024
4 8-20-206.5 IP(6)(d.5) A S-24-105 42 1 08/07/2024
4 8-20-206.5 (8)(b)(II) A S-24-105 42 1 08/07/2024
3, 4 8-42-105 (4)(b)(I) A H-24-1220 389 1 08/07/2024
3, 4 8-42-105 (4)(b)(I.5) N H-24-1220 389 1 08/07/2024
3, 4 8-42-107 (8)(c.5) A H-24-1220 389 2 08/07/2024
3, 51 8-42-107.5 A H-24-1220 389 3 01/01/2025
4 8-42-120 A H-24-1139 52 1 08/07/2024
4 8-42-124 (1) A S-24-155 59 1 08/07/2024
4 8-42-124 (6) A S-24-155 59 1 08/07/2024
4 8-42-124 (9) N S-24-155 59 1 08/07/2024
3, 4 8-42-127 N H-24-1220 389 4 08/07/2024
  8-43-204 (9) N S-24-149 482 2 06/07/2024
4 8-45-123 R H-24-1450 490 12 08/07/2024
4 8-47-101 (6) R H-24-1450 490 13 08/07/2024
4 8-47-203 IP(1) A S-24-155 59 2 08/07/2024
4 8-47-203 (1)(c)(I) A S-24-155 59 2 08/07/2024
2 8-47-205 A H-24-1467 430 3 06/05/2024
  8-71-102 (3) N H-24-1364 238 8 05/23/2024
2 8-76-102.5 IP(3)(a)(IV) A H-24-1409 318 2 06/15/2024
2 8-77-109 (1)(b) A H-24-1409 318 3 06/15/2024
2 8-77-109 (2)(a)(I)(B) A H-24-1409 318 3 06/15/2024
2 8-77-109 (2)(a)(II)(A) A H-24-1409 318 3 06/15/2024
2 8-77-109 (2)(a)(II)(B) R H-24-1409 318 3 06/15/2024
2 8-77-109 (2)(a.9)(II)(A) A H-24-1409 318 3 06/15/2024
2 8-77-109 IP(6)(a) A H-24-1409 318 3 06/15/2024
2 8-77-109 (6)(b) A H-24-1409 318 3 06/15/2024
  8-83-103 (4) N H-24-1364 238 9 05/23/2024
2 8-83-107 N H-24-1409 318 4 06/15/2024
2, 4 8-83-208 (1)(d) N H-24-1365 478 6 08/07/2024
  8-83-225 (4) N H-24-1364 238 10 05/23/2024
  8-83-502 (5.5) N H-24-1410 319 1 05/31/2024
  8-83-502 (7) A H-24-1410 319 1 05/31/2024
  8-83-503 (1) A H-24-1410 319 2 05/31/2024
  8-83-503 (2) A H-24-1410 319 2 05/31/2024
  8-83-503 IP(4) A H-24-1410 319 2 05/31/2024
  8-83-504 (1) A H-24-1410 319 3 05/31/2024
  8-83-504 (4)(a)(II) A H-24-1410 319 3 05/31/2024
  8-83-504 (4)(a)(III) R H-24-1410 319 3 05/31/2024
  8-83-504 (4)(b)(III) A H-24-1410 319 3 05/31/2024
  8-83-504.5 (1)(a)(III) A H-24-1410 319 4 05/31/2024
  8-83-504.5 (1)(a)(IV) R H-24-1410 319 4 05/31/2024
4 8-83-701 (5)(b) A H-24-1450 490 14 08/07/2024
4 8-83-901 (2) A H-24-1450 490 15 08/07/2024
2, 4 8-83-10 (entire part 10) N S-24-143 162 3 08/07/2024
  8-84-105 (1)(b.5) A H-24-1364 238 11 05/23/2024
  8-84-105 (1)(d) N H-24-1364 238 11 05/23/2024
2, 64 8-88- (entire article 88) N H-24-1360 324 2 07/01/2024
TITLE 9            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
4 9-5.7-102 (7) RE H-24-1450 490 16 08/07/2024
4 9-5.7-102 (8) RE H-24-1450 490 16 08/07/2024
TITLE 10            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
  10-1-133 (2)(a) A H-24-1440 320 2 05/31/2024
  10-1-136 (3.5) N H-24-1440 320 3 05/31/2024
2,4 10-1-145 N H-24-1315 417 2 08/07/2024
4 10-2-414.5 (1)(a) A H-24-1060 128 1 08/07/2024
4 10-2-414.5 (1)(c) A H-24-1060 128 1 08/07/2024
4 10-2-414.5 (1)(d) A H-24-1060 128 1 08/07/2024
4 10-2-414.5 (2)(a) A H-24-1060 128 1 08/07/2024
4 10-2-414.5 IP(2)(b) A H-24-1060 128 1 08/07/2024
4 10-2-414.5 (2)(c) A H-24-1060 128 1 08/07/2024
4 10-2-414.5 IP(4) A H-24-1060 128 1 08/07/2024
4 10-2-414.5 (6) A H-24-1060 128 1 08/07/2024
4 10-2-414.5 (7) A H-24-1060 128 1 08/07/2024
4 10-2-414.5 (10) N H-24-1060 128 1 08/07/2024
4 10-2-414.5 (11) N H-24-1060 128 1 08/07/2024
4 10-2-414.5 (12) N H-24-1060 128 1 08/07/2024
  10-3-209 (4)(a)(III)(A) A H-24-1470 491 2 06/07/2024
  10-3-209 (4)(a)(III)(C) N H-24-1470 491 2 06/07/2024
2, 3 10-3-209 (6) N H-24-1119 38 2 03/22/2024
7 10-3-705 A H-24-1321 252 5 01/01/2025
7 10-3-801 (4.3) N H-24-1321 252 1 01/01/2025
7 10-3-801 (7.5) N H-24-1321 252 1 01/01/2025
7 10-3-801 (8.5) N H-24-1321 252 1 01/01/2025
7 10-3-804 (12) A H-24-1321 252 2 01/01/2025
7 10-3-805 (1)(a)(V) A H-24-1321 252 3 01/01/2025
7 10-3-805 (1)(a)(VII) N H-24-1321 252 3 01/01/2025
7 10-3-805 (1)(a)(VIII) N H-24-1321 252 3 01/01/2025
7 10-3-805 (1)(a)(IX) N H-24-1321 252 3 01/01/2025
7 10-3-805 (1)(h) N H-24-1321 252 3 01/01/2025
7 10-3-805 (4) N H-24-1321 252 3 01/01/2025
7 10-3-808 (1) A H-24-1321 252 4 01/01/2025
7 10-3-808 (3)(a) A H-24-1321 252 4 01/01/2025
7 10-3-808 (3)(c) A H-24-1321 252 4 01/01/2025
7 10-3-808 (3)(d) A H-24-1321 252 4 01/01/2025
7 10-3-808 (6) A H-24-1321 252 4 01/01/2025
7 10-3-808 (7) N H-24-1321 252 4 01/01/2025
  10-3-1119 R H-24-1440 320 4 05/31/2024
  10-4-112 R H-24-1011 189 4 05/17/2024
4 10-4-122 N H-24-1108 312 1 08/07/2024
  10-4-123 N H-24-1440 320 1 05/31/2024
4 10-4-19 (entire part 19) N H-24-1060 128 2 08/07/2024
2, 3 10-5-111 (3) N H-24-1119 38 3 03/22/2024
4 10-7-103 (3) N S-24-068 406 19 08/07/2024
8 10-16-102 IP(40.5)(a) A S-24-073 146 1 01/01/2026
8 10-16-102 (40.5)(a)(II) A S-24-073 146 1 01/01/2026
8 10-16-102 IP(61)(b) A S-24-073 146 1 01/01/2026
8 10-16-102 (61)(b)(II) A S-24-073 146 1 01/01/2026
  10-16-104 (3)(e) N S-24-175 433 1 06/05/2024
  10-16-104 (24)(a)(II) A H-24-1132 331 4 06/03/2024
  10-16-104 (24)(b) A H-24-1132 331 4 06/03/2024
  10-16-104 (27) N H-24-1382 365 1 06/03/2024
  10-16-104 (28) N S-24-124 364 1 06/03/2024
8 10-16-105.1 (3.5) A S-24-073 146 2 01/01/2026
3, 7 10-16-105.9 N H-24-1258 335 1 01/01/2025
2, 3, 4 10-16-112.5 (2)(a) A H-24-1149 333 2 08/07/2024
2, 3, 4 10-16-112.5 (2)(c) A H-24-1149 333 2 08/07/2024
2, 3, 4 10-16-112.5 (3)(a)(I) A H-24-1149 333 2 08/07/2024
2, 3, 4 10-16-112.5 (3)(c)(II) A H-24-1149 333 2 08/07/2024
2, 3, 4 10-16-112.5 (3)(c)(III) N H-24-1149 333 2 08/07/2024
2, 3, 4 10-16-112.5 (3.5) N H-24-1149 333 2 08/07/2024
2, 3, 4 10-16-112.5 (4)(b) A H-24-1149 333 2 08/07/2024
2, 3, 4 10-16-112.5 (4)(c) N H-24-1149 333 2 08/07/2024
2, 3, 4 10-16-112.5 (5)(a) A H-24-1149 333 2 08/07/2024
2, 3, 4 10-16-112.5 (6) A H-24-1149 333 2 08/07/2024
2, 3, 4 10-16-112.5 (7)(e) A H-24-1149 333 2 08/07/2024
2, 4 10-16-116 (2) A H-24-1036 373 2 08/07/2024
2, 4 10-16-116 (5) A H-24-1036 373 2 08/07/2024
2, 3, 4 10-16-124.5 (2)(a)(II)(A) A H-24-1149 333 3 08/07/2024
2, 3, 4 10-16-124.5 (2)(c)(II)(A) A H-24-1149 333 3 08/07/2024
2, 3, 4 10-16-124.5 IP(3)(a) A H-24-1149 333 3 08/07/2024
2, 3, 4 10-16-124.5 (3)(a)(I) A H-24-1149 333 3 08/07/2024
2, 3, 4 10-16-124.5 (3)(a)(II) R H-24-1149 333 3 08/07/2024
2, 3, 4 10-16-124.5 (3)(a)(VI) A H-24-1149 333 3 08/07/2024
2, 3, 4 10-16-124.5 IP(3)(b) A H-24-1149 333 3 08/07/2024
2, 3, 4 10-16-124.5 (3.3) N H-24-1149 333 3 08/07/2024
2, 3, 4 10-16-124.5 (3.5) N H-24-1149 333 3 08/07/2024
2, 3, 4 10-16-124.5 (4) R H-24-1149 333 3 08/07/2024
2, 3, 4 10-16-124.5 (5) A H-24-1149 333 3 08/07/2024
2, 3, 4 10-16-124.5 (5.5) N H-24-1149 333 3 08/07/2024
2, 3, 4 10-16-124.5 (6) A H-24-1149 333 3 08/07/2024
2, 3, 4 10-16-124.5 (6.5) N H-24-1149 333 3 08/07/2024
92 10-16-124.6 N H-24-1045 470 1 08/07/2024
  10-16-134 R S-24-135 34 1 03/22/2024
92 10-16-144 (3) N H-24-1045 470 2 08/07/2024
  10-16-153 A H-24-1037 458 8 06/06/2024
8 10-16-155 (9) A S-24-073 146 3 05/01/2024
  10-16-162 (4)(b)(I)(E) A S-24-198 452 1 06/06/2024
4 10-16-167 N S-24-068 406 20 08/07/2024
  10-16-168 N S-24-080 411 1 06/05/2024
  10-16-169 N S-24-080 411 1 06/05/2024
15 10-16-407 (3)(c)(I) A H-24-1399 76 10 07/01/2025
  10-16-704 (14) R S-24-135 34 2 03/22/2024
  10-16-704 (16) R S-24-135 34 2 03/22/2024
3, 7 10-16-705 (4.5) N S-24-093 41 1 01/01/2025
  10-16-1206 IP(1) A H-24-1470 491 1 06/07/2024
  10-16-1206 (1)(c) A H-24-1470 491 1 06/07/2024
8 10-16-1401 IP(15)(a) A S-24-073 146 4 01/01/2026
8 10-16-1401 (15)(a)(II) A S-24-073 146 4 01/01/2026
4 10-16-1406 (2)(c) A S-24-203 454 1 08/07/2024
4 10-16-1406 (2)(d) A S-24-203 454 1 08/07/2024
4 10-16-1406 (2)(e) N S-24-203 454 1 08/07/2024
4 10-16-1406 (4)(h) A S-24-203 454 1 08/07/2024
4 10-22-106 IP(1) A H-24-1035 44 1 08/07/2024
4 10-22-106 (1)(d) A H-24-1035 44 1 08/07/2024
4 10-22-106 (1)(e) A H-24-1035 44 1 08/07/2024
4 10-22-107 (1)(a) A H-24-1035 44 2 08/07/2024
4 10-22-107 (2) A H-24-1035 44 2 08/07/2024
4 10-22-107 (7) A H-24-1035 44 2 08/07/2024
92 10-22.3-102 A H-24-1045 470 30 08/07/2024
TITLE 11            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
3, 4 11-30-101 (5) A H-24-1381 350 10 08/07/2024
3, 4 11-30-101.7 (3)(a) A H-24-1381 350 6 08/07/2024
3, 4 11-30-101.7 IP(5) A H-24-1381 350 6 08/07/2024
3, 4 11-30-101.7 (5)(b) A H-24-1381 350 6 08/07/2024
3, 4 11-30-101.7 (5)(c) A H-24-1381 350 6 08/07/2024
3, 4 11-30-101.7 (5)(d) R H-24-1381 350 6 08/07/2024
3, 4 11-30-106 (6) A H-24-1381 350 11 08/07/2024
3, 4 11-30-106.5 (3) A H-24-1381 350 5 08/07/2024
3, 4 11-30-107 A H-24-1381 350 7 08/07/2024
3, 4 11-30-109 (3) A H-24-1381 350 12 08/07/2024
3, 4 11-30-110 A H-24-1381 350 13 08/07/2024
3, 4 11-30-112 A H-24-1381 350 14 08/07/2024
3, 4 11-30-113 A H-24-1381 350 15 08/07/2024
3, 4 11-30-120 (1)(a) A H-24-1381 350 16 08/07/2024
3, 4 11-30-120 (1)(c) A H-24-1381 350 16 08/07/2024
3, 4 11-30-120 (2) A H-24-1381 350 16 08/07/2024
3, 4 11-30-122 (5) A H-24-1381 350 4 08/07/2024
3, 4 11-30-122 (8) N H-24-1381 350 4 08/07/2024
3, 4 11-30-124 R H-24-1381 350 9 08/07/2024
4 11-30-124 (6) R H-24-1450 490 17 08/07/2024
4 11-30-127 N S-24-066 141 2 08/07/2024
3, 4 11-40-105 (2) A H-24-1381 350 17 08/07/2024
3, 4 11-40-109 A H-24-1381 350 18 08/07/2024
3, 4 11-41-107 IP(2) A H-24-1381 350 19 08/07/2024
3, 4 11-41-107 (3) A H-24-1381 350 19 08/07/2024
3, 4 11-41-108 A H-24-1381 350 20 08/07/2024
3, 4 11-41-109 IP(1) A H-24-1381 350 21 08/07/2024
3, 4 11-41-109 (1)(a) A H-24-1381 350 21 08/07/2024
3, 4 11-41-109 (1)(c) A H-24-1381 350 21 08/07/2024
3, 4 11-41-109 (2) A H-24-1381 350 21 08/07/2024
3, 4 11-41-112 (1)(l) A H-24-1381 350 61 08/07/2024
3, 4 11-41-112 (1)(m) A H-24-1381 350 61 08/07/2024
3, 4 11-41-113 (1) A H-24-1381 350 62 08/07/2024
3, 4 11-41-114 IP(1) A H-24-1381 350 22 08/07/2024
3, 4 11-41-114 (1)(i)(III) A H-24-1381 350 22 08/07/2024
3, 4 11-41-117 (2) A H-24-1381 350 23 08/07/2024
3, 4 11-41-117.5 (4) A H-24-1381 350 24 08/07/2024
3, 4 11-41-119 (5) A H-24-1381 350 25 08/07/2024
3, 4 11-41-121 (1.5)(c) A H-24-1381 350 26 08/07/2024
3, 4 11-41-121 (3) A H-24-1381 350 26 08/07/2024
3, 4 11-41-121 (4) A H-24-1381 350 26 08/07/2024
3, 4 11-41-121 (5) R H-24-1381 350 26 08/07/2024
3, 4 11-41-121 (6) A H-24-1381 350 26 08/07/2024
3, 4 11-41-123 (2) A H-24-1381 350 27 08/07/2024
3, 4 11-41-123 (4) A H-24-1381 350 27 08/07/2024
3, 4 11-41-123 (5) A H-24-1381 350 27 08/07/2024
3, 4 11-41-126 A H-24-1381 350 28 08/07/2024
3, 4 11-41-128 A H-24-1381 350 29 08/07/2024
3, 4 11-41-129 (4) A H-24-1381 350 30 08/07/2024
3, 4 11-41-130 (1) A H-24-1381 350 31 08/07/2024
3, 4 11-41-130 (2) A H-24-1381 350 31 08/07/2024
3, 4 11-41-130 (6) A H-24-1381 350 31 08/07/2024
3, 4 11-41-130.5 (1) A H-24-1381 350 32 08/07/2024
3, 4 11-41-130.5 (3)(a)(I) A H-24-1381 350 32 08/07/2024
3, 4 11-41-130.5 (3)(b) A H-24-1381 350 32 08/07/2024
3, 4 11-41-131 (1) A H-24-1381 350 33 08/07/2024
3, 4 11-41-131 (3) A H-24-1381 350 33 08/07/2024
3, 4 11-41-131 (4) A H-24-1381 350 33 08/07/2024
3, 4 11-41-132 (3) A H-24-1381 350 34 08/07/2024
3, 4 11-41-133 IP(3) A H-24-1381 350 35 08/07/2024
3, 4 11-41-133 (6)(c) A H-24-1381 350 35 08/07/2024
3, 4 11-42-108 (1) A H-24-1381 350 36 08/07/2024
3, 4 11-42-109 (1) A H-24-1381 350 37 08/07/2024
3, 4 11-42-111 (14) A H-24-1381 350 63 08/07/2024
3, 4 11-42-112 (2) A H-24-1381 350 38 08/07/2024
3, 4 11-42-112 (3) A H-24-1381 350 38 08/07/2024
3, 4 11-42-115 (1) A H-24-1381 350 39 08/07/2024
3, 4 11-42-123 A H-24-1381 350 40 08/07/2024
3, 4 11-44-101.5 R H-24-1381 350 3 08/07/2024
3, 4 11-44-102 (3) A H-24-1381 350 41 08/07/2024
3, 4 11-44-103 A H-24-1381 350 42 08/07/2024
3, 4 11-44-103.5 A H-24-1381 350 43 08/07/2024
3, 4 11-44-104 A H-24-1381 350 44 08/07/2024
3, 4 11-44-105 A H-24-1381 350 45 08/07/2024
3, 4 11-44-106 A H-24-1381 350 46 08/07/2024
3, 4 11-44-106.5 (2)(b) A H-24-1381 350 47 08/07/2024
3, 4 11-44-107 (1)(c) A H-24-1381 350 64 08/07/2024
3, 4 11-44-107 (1)(f) A H-24-1381 350 64 08/07/2024
3, 4 11-44-109 (1) A H-24-1381 350 48 08/07/2024
3, 4 11-44-109 (1.5) A H-24-1381 350 48 08/07/2024
3, 4 11-44-109 (2) A H-24-1381 350 48 08/07/2024
3, 4 11-44-109 (3) A H-24-1381 350 48 08/07/2024
3, 4 11-44-109 (4) A H-24-1381 350 48 08/07/2024
3, 4 11-44-110 (1) A H-24-1381 350 49 08/07/2024
3, 4 11-44-110 (2) A H-24-1381 350 49 08/07/2024
3, 4 11-44-110 (4)(e) A H-24-1381 350 49 08/07/2024
3, 4 11-44-113 (1) A H-24-1381 350 50 08/07/2024
3, 4 11-44-113 (3) A H-24-1381 350 50 08/07/2024
3, 4 11-44-115 A H-24-1381 350 51 08/07/2024
3, 4 11-44-116 (1) A H-24-1381 350 52 08/07/2024
3, 4 11-44-116 (3) A H-24-1381 350 52 08/07/2024
3, 4 11-44-116 (5) A H-24-1381 350 52 08/07/2024
3, 4 11-44-116 (6) A H-24-1381 350 52 08/07/2024
3, 4 11-44-116 (7) A H-24-1381 350 52 08/07/2024
3, 4 11-44-116 (8) A H-24-1381 350 52 08/07/2024
3, 4 11-44-116 (11) A H-24-1381 350 52 08/07/2024
3, 4 11-44-117 A H-24-1381 350 53 08/07/2024
3, 4 11-44-118 A H-24-1381 350 54 08/07/2024
3, 4 11-44-120 (1) A H-24-1381 350 55 08/07/2024
3, 4 11-44-123 (3) A H-24-1381 350 8 08/07/2024
3, 4 11-44-124 N H-24-1381 350 2 08/07/2024
3, 4 11-45-101 IP(1) A H-24-1381 350 65 08/07/2024
3, 4 11-45-101 (1)(c) A H-24-1381 350 65 08/07/2024
3, 4 11-45-103 (1) A H-24-1381 350 66 08/07/2024
3, 4 11-46-106 A H-24-1381 350 56 08/07/2024
3, 4 11-46-108 IP(1) A H-24-1381 350 57 08/07/2024
3, 4 11-46-108 (1)(a) A H-24-1381 350 57 08/07/2024
3, 4 11-49-101 (4) A H-24-1381 350 58 08/07/2024
3, 4 11-49-101 (6) A H-24-1381 350 58 08/07/2024
3, 4 11-49-101 (7) A H-24-1381 350 58 08/07/2024
3, 4 11-49-101 (8) A H-24-1381 350 58 08/07/2024
3, 4 11-49-101 (10) A H-24-1381 350 58 08/07/2024
3, 4 11-49-102 IP(1) A H-24-1381 350 59 08/07/2024
3, 4 11-49-103 (1) A H-24-1381 350 60 08/07/2024
4 11-51-308.7 R S-24-180 197 1 08/07/2024
4 11-58-105 A H-24-1172 387 3 08/07/2024
4 11-101-401 (2) A H-24-1351 461 13 08/07/2024
4 11-102-101 (2) A H-24-1351 461 1 08/07/2024
4 11-102-101 (3) A H-24-1351 461 1 08/07/2024
4 11-102-103 (1)(a) A H-24-1351 461 2 08/07/2024
4 11-102-103 (6) A H-24-1351 461 2 08/07/2024
4 11-102-103 (12) R H-24-1351 461 2 08/07/2024
4 11-102-301 (1) A H-24-1351 461 14 08/07/2024
4 11-102-301 (2) A H-24-1351 461 14 08/07/2024
4 11-102-301 (3)(a) A H-24-1351 461 14 08/07/2024
4 11-102-303 (8) A H-24-1351 461 5 08/07/2024
4, 107 11-102-303 (9) A H-24-1351 461 4 08/07/2024
4, 107 11-102-303 (9) A H-24-1351 461 5 08/07/2024
4 11-102-305 (1)(a)(IV) A H-24-1351 461 6 08/07/2024
4 11-102-306 (2)(c) A H-24-1351 461 7 08/07/2024
4 11-102-502 A H-24-1351 461 15 08/07/2024
4 11-102-503 IP(1)(a)(I) A H-24-1351 461 8 08/07/2024
4 11-102-503 (1)(a)(I)(B) A H-24-1351 461 8 08/07/2024
4 11-102-503 (3) A H-24-1351 461 8 08/07/2024
4 11-102-505 (2) A H-24-1351 461 16 08/07/2024
4 11-103-203 (3) A H-24-1351 461 17 08/07/2024
4 11-103-203 (6) A H-24-1351 461 17 08/07/2024
4 11-103-203 (8) A H-24-1351 461 17 08/07/2024
4 11-103-301 A H-24-1351 461 18 08/07/2024
4 11-103-303 (1)(b) A H-24-1351 461 19 08/07/2024
4 11-103-304 (2) A H-24-1351 461 20 08/07/2024
4 11-103-402 (2) A H-24-1351 461 21 08/07/2024
4 11-103-403 (3) A H-24-1351 461 22 08/07/2024
4 11-103-501 (1) A H-24-1351 461 23 08/07/2024
4 11-103-501 (5) A H-24-1351 461 23 08/07/2024
4 11-103-801 (3) A H-24-1351 461 24 08/07/2024
4 11-103-802 (2)(a) A H-24-1351 461 25 08/07/2024
4 11-103-802 (3)(e) A H-24-1351 461 25 08/07/2024
4 11-103-804 (2) A H-24-1351 461 26 08/07/2024
4 11-103-804 (7)(a) A H-24-1351 461 26 08/07/2024
4 11-103-804 (11) A H-24-1351 461 26 08/07/2024
4 11-105-101 (7) A H-24-1351 461 27 08/07/2024
4 11-105-104 (1) A H-24-1351 461 28 08/07/2024
4 11-105-211 N S-24-066 141 3 08/07/2024
4 11-105-405 (2)(b) A H-24-1351 461 29 08/07/2024
4 11-107-101 A H-24-1351 461 30 08/07/2024
4 11-107-102 A H-24-1351 461 31 08/07/2024
4 11-107-108 (2) A H-24-1351 461 32 08/07/2024
4 11-107-108 (3) A H-24-1351 461 32 08/07/2024
4 11-109-104 (7) A H-24-1351 461 33 08/07/2024
4 11-109-104 (8)(a) A H-24-1351 461 33 08/07/2024
4 11-109-402 (4)(a) A H-24-1351 461 9 08/07/2024
4 11-109-402 (5) A H-24-1351 461 9 08/07/2024
4 11-109-402 (6) A H-24-1351 461 9 08/07/2024
4 11-109-601 A H-24-1351 461 34 08/07/2024
4 11-109-602 IP(1)(a)(I) A H-24-1351 461 10 08/07/2024
4 11-109-602 (1)(a)(I)(B) A H-24-1351 461 10 08/07/2024
4 11-109-602 (3) A H-24-1351 461 10 08/07/2024
4 11-109-604 IP(1) A H-24-1351 461 35 08/07/2024
4 11-109-604 (2) A H-24-1351 461 35 08/07/2024
4 11-109-604 (3) A H-24-1351 461 35 08/07/2024
4 11-109-605 (1) A H-24-1351 461 36 08/07/2024
4 11-109-607 A H-24-1351 461 37 08/07/2024
4 11-109-701 (1) A H-24-1351 461 11 08/07/2024
4 11-109-701 (2)(c) A H-24-1351 461 11 08/07/2024
4 11-109-702 (2)(b) A H-24-1351 461 38 08/07/2024
4 11-109-704 IP(1) A H-24-1351 461 39 08/07/2024
4 11-109-704 (1)(c) A H-24-1351 461 39 08/07/2024
4 11-109-704 (10) A H-24-1351 461 39 08/07/2024
4 11-109-908 N H-24-1351 461 12 08/07/2024
4 11-110-106 A H-24-1328 341 9 08/07/2024
4 11-110-107 IP(1) A H-24-1328 341 6 08/07/2024
4 11-110-107 (1)(a) A H-24-1328 341 10 08/07/2024
4 11-110-107 (1)(e) A H-24-1328 341 6 08/07/2024
4 11-110-108 (1)(a) A H-24-1328 341 4 08/07/2024
4 11-110-108 (1)(b) A H-24-1328 341 4 08/07/2024
4 11-110-108 (4) A H-24-1328 341 4 08/07/2024
4 11-110-109 (1) A H-24-1328 341 11 08/07/2024
4 11-110-109 (2) A H-24-1328 341 11 08/07/2024
4 11-110-109 (3) A H-24-1328 341 11 08/07/2024
4 11-110-111 (1)(a) A H-24-1328 341 5 08/07/2024
4 11-110-111 (2)(c) A H-24-1328 341 5 08/07/2024
4 11-110-115 (1) A H-24-1328 341 3 08/07/2024
4 11-110-115 IP(2) A H-24-1328 341 3 08/07/2024
4 11-110-115 (3) A H-24-1328 341 12 08/07/2024
4 11-110-119 (1)(d) N H-24-1328 341 8 08/07/2024
4 11-110-121 A H-24-1328 341 2 08/07/2024
4 11-110-201 (1)(b) R H-24-1328 341 7 08/07/2024
4 11-111- (entire article 111) N H-24-1232 200 1 08/07/2024
TITLE 12            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
4 12-10-501 (1) A H-24-1094 263 2 08/07/2024
4 12-10-501 (1.5) N H-24-1094 263 2 08/07/2024
4 12-10-502 (3) N H-24-1094 263 1 08/07/2024
4 12-10-801 (3)(a.5) N S-24-021 53 2 08/07/2024
2, 4 12-15-103 IP(1) A S-24-126 211 2 08/07/2024
2, 4 12-15-103 (1)(a) A S-24-126 211 2 08/07/2024
2, 4 12-15-103 IP(1)(d) A S-24-126 211 2 08/07/2024
2, 4 12-15-103 (1)(d)(I) A S-24-126 211 2 08/07/2024
2, 4 12-15-103 (1)(d)(III) N S-24-126 211 2 08/07/2024
2, 4 12-15-103 (8) R S-24-126 211 2 08/07/2024
2, 4 12-15-104 (13) R S-24-126 211 3 08/07/2024
2, 4 12-15-105 (1)(c) A S-24-126 211 4 08/07/2024
2, 4 12-15-105 (3) A S-24-126 211 4 08/07/2024
2, 4 12-15-106 (10) A S-24-126 211 5 08/07/2024
1, 2 12-20-202 (1)(b) A H-24-1097 70 3 09/01/2024
1, 2 12-20-202 (3)(f) A H-24-1097 70 3 09/01/2024
3, 4 12-20-202 (5) A H-24-1004 371 2 08/07/2024
4, 5 12-20-204 (2)(a) A H-24-1254 241 6 08/07/2024
5 12-20-204 (2)(a) A S-24-173 240 4 05/24/2024
5 12-20-204 (2)(a) A H-24-1335 242 4 05/24/2024
4, 83 12-20-204 (2)(c) A H-24-1254 241 6 08/07/2024
5 12-20-204 (2)(c) R S-24-173 240 4 05/24/2024
5 12-20-204 (2)(c) R H-24-1335 242 4 05/24/2024
4 12-20-204 (2)(d) R H-24-1254 241 6 08/07/2024
3, 4 12-20-206 N H-24-1004 371 1 08/07/2024
  12-20-406 (2)(b)(III) R S-24-173 240 5 05/24/2024
  12-20-407 (1)(a)(IV) A H-24-1344 343 27 07/01/2025
4 12-20-407 IP(1)(e) A H-24-1450 490 18 08/07/2024
  12-30-109 (4)(e) A S-24-047 440 1 06/06/2024
  12-30-109 (4)(f) R S-24-047 440 1 06/06/2024
  12-30-110 IP(1)(a) A H-24-1037 458 9 06/06/2024
  12-30-110 (1)(a)(I) A H-24-1037 458 9 06/06/2024
  12-30-110 (1)(a)(II) A H-24-1037 458 9 06/06/2024
2, 4 12-30-110 (1)(a)(V) A H-24-1003 121 5 08/07/2024
  12-30-110 (1)(b) A H-24-1037 458 9 06/06/2024
  12-30-110 (2) A H-24-1037 458 9 06/06/2024
  12-30-110 (3) A H-24-1037 458 9 06/06/2024
  12-30-110 (3.5)(a) A H-24-1037 458 9 06/06/2024
  12-30-110 IP(3.5)(b) A H-24-1037 458 9 06/06/2024
  12-30-110 (4)(a) A H-24-1037 458 9 06/06/2024
  12-30-110 (5) A H-24-1037 458 9 06/06/2024
  12-30-110 (7)(a.3) A H-24-1037 458 9 06/06/2024
  12-30-110 (7)(b) A H-24-1037 458 9 06/06/2024
  12-30-110 (7)(c) A H-24-1037 458 9 06/06/2024
  12-30-110 (7)(d) A H-24-1037 458 9 06/06/2024
  12-30-110 IP(7)(e) A H-24-1037 458 9 06/06/2024
  12-30-110 (7)(e)(II) A H-24-1037 458 9 06/06/2024
  12-30-110 (7)(i) A H-24-1037 458 9 06/06/2024
3, 7 12-30-112 (3.7) N S-24-093 41 2 01/01/2025
  12-30-123 N S-24-087 120 1 04/22/2024
  12-30-124 N S-24-141 480 1 06/07/2024
4 12-105-125.5 N H-24-1111 381 2 08/07/2024
4 12-120-103 (2) A H-24-1329 342 2 08/07/2024
4 12-120-103 (4)(a) A H-24-1329 342 2 08/07/2024
4 12-120-103 (4)(b)(I) R H-24-1329 342 2 08/07/2024
4 12-120-103 (4)(c)(I) R H-24-1329 342 2 08/07/2024
4 12-120-104 IP(1)(c) A H-24-1329 342 3 08/07/2024
4 12-120-104 (1)(c)(III) R H-24-1329 342 3 08/07/2024
4 12-120-104 (2)(b) A H-24-1329 342 3 08/07/2024
4 12-120-104 (3)(a) A H-24-1329 342 3 08/07/2024
4 12-120-104 (3)(c) N H-24-1329 342 3 08/07/2024
4 12-120-202 (6)(b) A H-24-1329 342 15 08/07/2024
4 12-120-203 IP(1) A H-24-1329 342 4 08/07/2024
4 12-120-205 (1) A H-24-1329 342 16 08/07/2024
4 12-120-206 (1)(n) N H-24-1329 342 5 08/07/2024
4 12-120-206 (2) A H-24-1329 342 17 08/07/2024
4 12-120-211 (1) R H-24-1329 342 6 08/07/2024
4 12-120-211 (2)(a) A H-24-1329 342 6 08/07/2024
4 12-120-211 (3)(a) A H-24-1329 342 6 08/07/2024
4 12-120-211 (4)(a) A H-24-1329 342 6 08/07/2024
4 12-120-213 (1) R H-24-1329 342 7 08/07/2024
4 12-120-213 (2)(a) A H-24-1329 342 7 08/07/2024
4 12-120-213 (3)(a) A H-24-1329 342 7 08/07/2024
4 12-120-215 (1)(a)(III) R H-24-1329 342 8 08/07/2024
4 12-120-215 (1)(a)(IV) A H-24-1329 342 8 08/07/2024
4 12-120-215 (1)(a)(VII) A H-24-1329 342 8 08/07/2024
4 12-120-215 (1)(b)(I) A H-24-1329 342 8 08/07/2024
4 12-120-215 (1)(b)(II) A H-24-1329 342 8 08/07/2024
4 12-120-215 (1)(b)(III) R H-24-1329 342 8 08/07/2024
4 12-120-302 (5)(b) A H-24-1329 342 18 08/07/2024
4 12-120-306 IP(1) A H-24-1329 342 9 08/07/2024
4 12-120-306 (1)(m) A H-24-1329 342 9 08/07/2024
4 12-120-306 (1)(n) A H-24-1329 342 9 08/07/2024
4 12-120-306 (1)(o) N H-24-1329 342 9 08/07/2024
4 12-120-306 (2) A H-24-1329 342 19 08/07/2024
4 12-120-311 (1) R H-24-1329 342 10 08/07/2024
4 12-120-311 (2)(a) A H-24-1329 342 10 08/07/2024
4 12-120-311 (3)(a) A H-24-1329 342 10 08/07/2024
4 12-120-313 (1) R H-24-1329 342 11 08/07/2024
4 12-120-313 (2)(a) A H-24-1329 342 11 08/07/2024
4 12-120-315 (1)(a)(III) R H-24-1329 342 12 08/07/2024
4 12-120-315 (1)(a)(IV) A H-24-1329 342 12 08/07/2024
4 12-120-315 (1)(a)(VII) A H-24-1329 342 12 08/07/2024
4 12-120-315 (1)(b)(I) A H-24-1329 342 12 08/07/2024
4 12-120-315 (1)(b)(II) A H-24-1329 342 12 08/07/2024
4 12-120-315 (1)(b)(III) R H-24-1329 342 12 08/07/2024
4 12-120-402 (5)(c) A H-24-1329 342 20 08/07/2024
4 12-120-403 (4) A H-24-1329 342 21 08/07/2024
4 12-120-404 (3)(b) A H-24-1329 342 22 08/07/2024
4 12-120-405 (2)(a) A H-24-1329 342 23 08/07/2024
4 12-120-406 (1)(q) A H-24-1329 342 13 08/07/2024
4 12-120-406 (1)(r) A H-24-1329 342 13 08/07/2024
4 12-120-406 (1)(s) N H-24-1329 342 13 08/07/2024
4 12-120-406 (6) A H-24-1329 342 24 08/07/2024
4 12-120-413 (3) A H-24-1329 342 14 08/07/2024
4 12-120-414 (1) A H-24-1329 342 25 08/07/2024
4 12-120-417 (2) A H-24-1329 342 26 08/07/2024
  12-135-103 (1) A S-24-173 240 1 05/24/2024
  12-135-103 (1.5) N S-24-173 240 1 05/24/2024
  12-135-103 (7) A S-24-173 240 1 05/24/2024
  12-135-103 (10) R S-24-173 240 1 05/24/2024
  12-135-103 (12) A S-24-173 240 1 05/24/2024
  12-135-103 (15) A S-24-173 240 1 05/24/2024
  12-135-103 (22) A S-24-173 240 1 05/24/2024
  12-135-103 (22.3) N S-24-173 240 1 05/24/2024
  12-135-103 (22.6) N S-24-173 240 1 05/24/2024
  12-135-103 (26) R S-24-173 240 1 05/24/2024
  12-135-103 (28) N S-24-173 240 1 05/24/2024
  12-135-104 (1.5) N H-24-1335 242 9 05/24/2024
  12-135-105 (1)(d) A H-24-1335 242 10 05/24/2024
  12-135-105 (1)(o) A H-24-1335 242 10 05/24/2024
4 12-135-105 (1)(p) A H-24-1254 241 7 08/07/2024
  12-135-109 (4)(b) A H-24-1335 242 11 05/24/2024
  12-135-109 (6) N H-24-1335 242 11 05/24/2024
  12-135-110 IP(3) A S-24-173 240 6 05/24/2024
  12-135-110 (3)(d) A S-24-173 240 6 05/24/2024
  12-135-110 (3)(e) A S-24-173 240 6 05/24/2024
  12-135-110 (3)(f) N S-24-173 240 6 05/24/2024
  12-135-110 (4) A S-24-173 240 6 05/24/2024
38 12-135-111 R S-24-173 240 3 05/24/2024
84 12-135-111 IP(1) A H-24-1335 242 8 05/24/2024
84 12-135-111 IP(2) A H-24-1335 242 6 05/24/2024
84 12-135-111 IP(3) A H-24-1335 242 6 05/24/2024
  12-135-112 (1)(a) R H-24-1335 242 12 05/24/2024
  12-135-112 (4) N H-24-1335 242 12 05/24/2024
  12-135-113 (4) N H-24-1335 242 13 05/24/2024
  12-135-114 N H-24-1335 242 14 05/24/2024
  12-135-302 (1)(b) A H-24-1335 242 15 05/24/2024
  12-135-303 (4) A S-24-173 240 7 05/24/2024
38 12-135-304 R S-24-173 240 3 05/24/2024
84 12-135-304 A H-24-1335 242 7 05/24/2024
  12-135-307 (5)(b) A H-24-1335 242 16 05/24/2024
82 12-135-401 IP(1) A S-24-173 240 8 05/24/2024
82 12-135-401 IP(1) A H-24-1335 242 3 05/24/2024
82 12-135-401 (1)(b) A S-24-173 240 8 05/24/2024
82 12-135-401 (1)(b) A H-24-1335 242 3 05/24/2024
82 12-135-401 (1)(c) A S-24-173 240 8 05/24/2024
82 12-135-401 (1)(c) A H-24-1335 242 3 05/24/2024
  12-135-401 (1)(d) N H-24-1335 242 3 05/24/2024
  12-135-401 (2) A S-24-173 240 8 05/24/2024
82 12-135-401 (3)(a) A S-24-173 240 8 05/24/2024
82 12-135-401 (3)(a) A H-24-1335 242 3 05/24/2024
  12-135-401 (4) A S-24-173 240 8 05/24/2024
  12-135-401 (5) A S-24-173 240 8 05/24/2024
5 12-135-401 (6) A H-24-1335 242 3 05/24/2024
5 12-135-401 (6)(a) A S-24-173 240 8 05/24/2024
  12-135-401 (7) N H-24-1335 242 3 05/24/2024
  12-135-402 A S-24-173 240 9 05/24/2024
  12-135-403 A H-24-1335 242 5 05/24/2024
  12-135-404 A S-24-173 240 10 05/24/2024
82 12-135-406 A S-24-173 240 11 05/24/2024
82 12-135-406 A H-24-1335 242 1 05/24/2024
37 12-135-5 (entire part 5) N S-24-173 240 2 05/24/2024
  12-135-6 (entire part 6) N S-24-173 240 2 05/24/2024
  12-135-7 (entire part 7) N S-24-173 240 2 05/24/2024
  12-135-8 (entire part 8) N S-24-173 240 2 05/24/2024
  12-135-9 (entire part 9) N S-24-173 240 2 05/24/2024
4 12-140-102 (3) A H-24-1254 241 8 08/07/2024
4 12-140-103 (1)(c) N H-24-1254 241 2 08/07/2024
4 12-140-103 (4) A H-24-1254 241 2 08/07/2024
4 12-140-104 (4) N H-24-1254 241 9 08/07/2024
4 12-140-105 (1)(b) A H-24-1254 241 3 08/07/2024
4 12-140-105 (1)(c) A H-24-1254 241 3 08/07/2024
4 12-140-105 (1)(d) N H-24-1254 241 3 08/07/2024
4 12-140-105 (4) N H-24-1254 241 3 08/07/2024
4 12-140-105 (5) N H-24-1254 241 3 08/07/2024
4 12-140-106 (1)(b) A H-24-1254 241 4 08/07/2024
4 12-140-106 (1)(d) N H-24-1254 241 4 08/07/2024
4 12-140-106 (1)(e) N H-24-1254 241 4 08/07/2024
4 12-140-106 (1)(f) N H-24-1254 241 4 08/07/2024
4 12-140-106 (1)(g) N H-24-1254 241 4 08/07/2024
4 12-140-108 A H-24-1254 241 10 08/07/2024
4 12-140-109 N H-24-1254 241 5 08/07/2024
119 12-155-103 (3) A H-24-1344 343 1 07/01/2024
119 12-155-103 (3) A H-24-1344 343 2 07/01/2025
119 12-155-103 (9) A H-24-1344 343 1 07/01/2024
119 12-155-103 (9) A H-24-1344 343 2 07/01/2025
119 12-155-103 (13) A H-24-1344 343 1 07/01/2024
119 12-155-103 (13) A H-24-1344 343 2 07/01/2025
  12-155-103 IP(14)(a) A H-24-1344 343 1 07/01/2024
  12-155-103 (14)(b) R H-24-1344 343 1 07/01/2024
  12-155-103 IP(15)(a) A H-24-1344 343 1 07/01/2024
  12-155-103 (15)(b) R H-24-1344 343 1 07/01/2024
  12-155-103 IP(16)(a) A H-24-1344 343 1 07/01/2024
  12-155-103 (16)(b) R H-24-1344 343 1 07/01/2024
  12-155-104 (2)(a)(I)(A) A H-24-1344 343 4 07/01/2025
  12-155-104 (4) R H-24-1344 343 3 07/01/2024
  12-155-104 (5) A H-24-1344 343 3 07/01/2024
  12-155-105 (1)(c) A H-24-1344 343 5 07/01/2025
  12-155-105 (1)(h) A H-24-1344 343 5 07/01/2025
  12-155-107 A H-24-1344 343 6 07/01/2024
122 12-155-108 (1) A H-24-1344 343 7 07/01/2024
122 12-155-108 (1) A H-24-1344 343 8 07/01/2025
  12-155-108 (3) A H-24-1344 343 7 07/01/2024
  12-155-108 (6)(b) A H-24-1344 343 7 07/01/2024
  12-155-109 (1) A H-24-1344 343 10 07/01/2025
123 12-155-109 (2) A H-24-1344 343 9 07/01/2024
123 12-155-109 (2) A H-24-1344 343 10 07/01/2025
  12-155-110 (1)(a) A H-24-1344 343 12 07/01/2025
  12-155-110 IP(1)(b) A H-24-1344 343 11 07/01/2024
  12-155-110 (1)(b)(I) A H-24-1344 343 11 07/01/2024
  12-155-112 (1) A H-24-1344 343 13 07/01/2024
  12-155-113 (1)(a) A H-24-1344 343 14 07/01/2024
  12-155-113 (1)(l) A H-24-1344 343 14 07/01/2024
  12-155-113 (1)(o) A H-24-1344 343 15 07/01/2025
  12-155-113 (1)(p) A H-24-1344 343 15 07/01/2025
  12-155-113 (1)(s) N H-24-1344 343 14 07/01/2024
  12-155-113 (2) A H-24-1344 343 14 07/01/2024
124 12-155-117 (1) A H-24-1344 343 16 07/01/2024
124 12-155-117 (1) A H-24-1344 343 17 07/01/2025
124 12-155-117 (4) A H-24-1344 343 16 07/01/2024
124 12-155-117 (4) A H-24-1344 343 17 07/01/2025
  12-155-118 (2) A H-24-1344 343 18 07/01/2024
  12-155-118 (4) A H-24-1344 343 18 07/01/2024
  12-155-119 (1)(a) A H-24-1344 343 20 07/01/2025
  12-155-119 (4)(a) A H-24-1344 343 20 07/01/2025
5 12-155-119 IP(5)(c) A H-24-1344 343 19 07/01/2024
5 12-155-119 (5)(c) A H-24-1344 343 20 07/01/2025
  12-155-120 (7)(a) A H-24-1344 343 21 07/01/2024
  12-155-120 (7)(b) A H-24-1344 343 21 07/01/2024
  12-155-120 (7)(c) A H-24-1344 343 21 07/01/2024
125 12-155-122 A H-24-1344 343 23 07/01/2025
125 12-155-122 (2) A H-24-1344 343 22 07/01/2024
  12-155-123 (1)(a) A H-24-1344 343 24 07/01/2024
  12-155-123 (1)(b) A H-24-1344 343 24 07/01/2024
  12-155-123 (1)(c)(I) A H-24-1344 343 24 07/01/2024
  12-155-123 (3)(b) A H-24-1344 343 24 07/01/2024
  12-155-123 (4)(b) A H-24-1344 343 24 07/01/2024
  12-155-123 (4)(c) A H-24-1344 343 24 07/01/2024
  12-155-124 (1) A H-24-1344 343 25 07/01/2025
  12-155-124 (2) A H-24-1344 343 25 07/01/2025
  12-155-125 N H-24-1344 343 26 07/01/2024
  12-170-104 (8) A S-24-198 452 2 06/06/2024
  12-170-104 (12)(a)(II) A S-24-198 452 2 06/06/2024
  12-170-105 (1)(a)(II)(L) N S-24-198 452 3 06/06/2024
  12-170-105 (1)(a)(II)(M) N S-24-198 452 3 06/06/2024
  12-170-105 (1)(e) A S-24-198 452 3 06/06/2024
  12-170-105 (1)(h)(I) R S-24-198 452 3 06/06/2024
  12-170-105 (5) N S-24-198 452 3 06/06/2024
  12-170-105 (6) N S-24-198 452 3 06/06/2024
  12-170-105 (7) N S-24-198 452 3 06/06/2024
  12-170-105 (8) N S-24-198 452 3 06/06/2024
4 12-220-109 N S-24-010 193 2 08/07/2024
2 12-225-114 NC H-24-1262 393 2 06/04/2024
3 12-235-108 (1)(a) A S-24-201 484 1 06/07/2024
4 12-240-106 (1)(b) A H-24-1153 385 2 08/07/2024
4 12-240-106 (1)(c) A H-24-1153 385 2 08/07/2024
4 12-240-106 (1)(d) N H-24-1153 385 2 08/07/2024
4 12-240-120 (1)(c) A H-24-1153 385 5 08/07/2024
4 12-240-120 (1)(d) A H-24-1153 385 5 08/07/2024
4 12-240-120 (1)(e) N H-24-1153 385 5 08/07/2024
4 12-240-121 (1)(ii) N H-24-1153 385 3 08/07/2024
  12-240-124 A H-24-1037 458 10 06/06/2024
4 12-240-130 (1) A H-24-1153 385 1 08/07/2024
4 12-240-130 (2)(a) A H-24-1153 385 1 08/07/2024
4 12-240-130 (3) R H-24-1153 385 1 08/07/2024
4 12-240-130 (5) N H-24-1153 385 1 08/07/2024
4 12-240-130 (6) N H-24-1153 385 1 08/07/2024
4 12-240-130.5 N H-24-1153 385 4 08/07/2024
  12-240-139 (1)(a)(I)(C) A H-24-1037 458 1 06/06/2024
4 12-240-141 (5) A H-24-1153 385 6 08/07/2024
4 12-240-146 N S-24-018 194 2 08/07/2024
  12-245-210 (2) A H-24-1037 458 11 06/06/2024
4 12-245-216 (1)(b)(I) R S-24-115 217 1 08/07/2024
4 12-245-232 (3) N S-24-115 217 2 08/07/2024
4 12-245-304 (3)(a)(II) R S-24-115 217 3 08/07/2024
4 12-245-304 (3)(a)(III) N S-24-115 217 3 08/07/2024
4 12-245-304 (3)(b) A S-24-115 217 3 08/07/2024
4 12-245-304 (3)(c) N S-24-115 217 3 08/07/2024
92 12-245-403 (5) N H-24-1045 470 3 08/07/2024
4 12-245-404 (1)(c) A S-24-115 217 4 08/07/2024
4 12-245-404 (3)(a) A S-24-115 217 4 08/07/2024
4 12-245-404 (4)(a)(II) R S-24-115 217 4 08/07/2024
4 12-245-404 (4)(a)(III) N S-24-115 217 4 08/07/2024
4, 46 12-245-404 (4)(b) A S-24-115 217 4 08/07/2024
4, 48 12-245-404 (4)(b) A H-24-1450 490 100 08/07/2024
4 12-245-404 (4)(c) N S-24-115 217 4 08/07/2024
4 12-245-408 A S-24-115 217 5 08/07/2024
4 12-245-411 N H-24-1002 326 2 08/07/2024
92 12-245-503 (5) N H-24-1045 470 4 08/07/2024
92 12-245-504 (1.5) N H-24-1045 470 5 08/07/2024
4 12-245-504 (4)(a)(III) R S-24-115 217 6 08/07/2024
4 12-245-504 (4)(a)(IV) N S-24-115 217 6 08/07/2024
4 12-245-504 (4)(c) A S-24-115 217 6 08/07/2024
4 12-245-504 (4)(d) N S-24-115 217 6 08/07/2024
92 12-245-603 (3) N H-24-1045 470 6 08/07/2024
4 12-245-604 (1)(d) A S-24-115 217 7 08/07/2024
92 12-245-604 (1.5) N H-24-1045 470 7 08/07/2024
4 12-245-604 (4)(a)(II) A S-24-115 217 7 08/07/2024
4 12-245-604 (4)(a)(III) R S-24-115 217 7 08/07/2024
4 12-245-604 (4)(c) A S-24-115 217 7 08/07/2024
4 12-245-604 (4)(d) N S-24-115 217 7 08/07/2024
92 12-245-803 (5) N H-24-1045 470 8 08/07/2024
4 12-245-804 (3.7) A S-24-115 217 8 08/07/2024
92 12-245-805 (2.5)(c) N H-24-1045 470 9 08/07/2024
  12-255-119 (1)(a) A H-24-1441 489 1 07/01/2024
  12-255-128 A H-24-1037 458 12 06/06/2024
3 12-280-103 (22.5) N S-24-209 456 1 07/01/2024
92 12-280-103 (27.5) N H-24-1045 470 10 08/07/2024
3 12-280-103 (38.5)(a)(VIII) A S-24-209 456 1 07/01/2024
3 12-280-103 (38.5)(a)(X) N S-24-209 456 1 07/01/2024
3 12-280-103 (38.5)(a)(XI) N S-24-209 456 1 07/01/2024
94 12-280-103 (39)(g)(III) A H-24-1037 458 13 06/06/2024
92, 94 12-280-103 (39)(g)(III) A H-24-1045 470 10 08/07/2024
92 12-280-103 (39)(g)(IV)(C) A H-24-1045 470 10 08/07/2024
92 12-280-103 (39)(g)(V) N H-24-1045 470 10 08/07/2024
92 12-280-103 (39)(j) A H-24-1045 470 10 08/07/2024
92 12-280-103 (39)(k) A H-24-1045 470 10 08/07/2024
92 12-280-103 (39)(l) N H-24-1045 470 10 08/07/2024
  12-280-103 (40) A H-24-1037 458 13 06/06/2024
3 12-280-103 (50)(a)(II) R S-24-209 456 1 07/01/2024
3 12-280-103 (50)(c)(I) R S-24-209 456 1 07/01/2024
3 12-280-108 (1)(k) A S-24-209 456 2 07/01/2024
  12-280-123 IP(1)(c)(I) A H-24-1037 458 14 06/06/2024
  12-280-123 (1)(c)(II) A H-24-1037 458 14 06/06/2024
  12-280-123 (3) A H-24-1037 458 14 06/06/2024
4 12-280-124 (4) N H-24-1115 321 1 08/07/2024
  12-280-139 (1)(b) R H-24-1438 351 2 06/03/2024
  12-280-139 (4) A H-24-1438 351 2 06/03/2024
  12-280-139 (9) A H-24-1438 351 2 06/03/2024
  12-280-139 (11) A H-24-1438 351 2 06/03/2024
  12-280-140 (3)(a) A H-24-1438 351 3 06/03/2024
  12-280-140 (7) A H-24-1438 351 3 06/03/2024
  12-280-140 (9) A H-24-1438 351 3 06/03/2024
4 12-280-141 (2) A H-24-1450 490 19 08/07/2024
  12-280-142 (1)(b) R H-24-1438 351 4 06/03/2024
  12-280-142 (4) A H-24-1438 351 4 06/03/2024
  12-280-142 (6)(b)(II) A H-24-1438 351 4 06/03/2024
  12-280-142 (9) A H-24-1438 351 4 06/03/2024
  12-280-142 (11) A H-24-1438 351 4 06/03/2024
3 12-280-143 N S-24-209 456 3 07/01/2024
  12-280-402 (2.3) N S-24-047 440 2 06/06/2024
  12-280-402 (2.5) N S-24-047 440 2 06/06/2024
  12-280-403 IP(1) A S-24-047 440 3 06/06/2024
  12-280-403 (2)(a) A S-24-047 440 3 06/06/2024
  12-280-403 (2)(b) A S-24-047 440 3 06/06/2024
  12-280-403 (2)(c) A S-24-047 440 3 06/06/2024
  12-280-403 (3) A S-24-047 440 3 06/06/2024
  12-280-404 (2)(b)(I) R S-24-047 440 4 06/06/2024
  12-280-404 (2)(c) A S-24-047 440 4 06/06/2024
  12-280-404 (3)(b) A S-24-047 440 4 06/06/2024
  12-280-404 (3)(c)(I) A S-24-047 440 4 06/06/2024
  12-280-404 (3)(d) A S-24-047 440 4 06/06/2024
  12-280-404 (3)(f) A S-24-047 440 4 06/06/2024
  12-280-404 (3)(m) N S-24-047 440 4 06/06/2024
  12-280-404 (3)(n) N S-24-047 440 4 06/06/2024
  12-280-404 IP(4)(a) A S-24-047 440 4 06/06/2024
  12-280-404 (4)(a.5) A S-24-047 440 4 06/06/2024
  12-280-404 (4)(c) A S-24-047 440 4 06/06/2024
  12-280-407 (2) A S-24-047 440 5 06/06/2024
92 12-280-604 N H-24-1045 470 11 08/07/2024
4 12-285-104 (4) A H-24-1327 421 5 08/07/2024
4 12-285-104 IP(6)(a)(II) A H-24-1327 421 1 08/07/2024
4, 5 12-285-104 (6)(a)(II)(E) A H-24-1327 421 1 08/07/2024
4, 5 12-285-104 (6)(a)(II)(E) A H-24-1327 421 5 08/07/2024
4, 49 12-285-104 (6)(a)(II)(F) A H-24-1327 421 1 08/07/2024
4, 49 12-285-104 (6)(a)(II)(F) A H-24-1327 421 5 08/07/2024
4 12-285-104 (6)(a)(II)(G) N H-24-1327 421 1 08/07/2024
4 12-285-104 (6)(a)(II)(H) N H-24-1327 421 5 08/07/2024
4 12-285-104 (6)(b)(III) A H-24-1327 421 5 08/07/2024
4 12-285-107 A H-24-1327 421 6 08/07/2024
4 12-285-113 IP(1) A H-24-1327 421 7 08/07/2024
4 12-285-113 (1)(b) A H-24-1327 421 7 08/07/2024
4 12-285-116 (3) A H-24-1327 421 8 08/07/2024
4 12-285-132 A H-24-1327 421 2 08/07/2024
4 12-285-203 (3) N H-24-1327 421 9 08/07/2024
4 12-285-207 IP(1) A H-24-1327 421 10 08/07/2024
4 12-285-207 (1)(b) A H-24-1327 421 10 08/07/2024
4 12-285-220 A H-24-1327 421 3 08/07/2024
4 12-300-104 (3)(c) A H-24-1253 179 3 08/07/2024
4 12-300-104 (3)(d)(II) A H-24-1253 179 3 08/07/2024
4 12-300-104 (3)(e) A H-24-1253 179 3 08/07/2024
4 12-300-107 (2) A H-24-1253 179 5 08/07/2024
4 12-300-108 A H-24-1253 179 6 08/07/2024
4 12-300-112 (1)(a)(III) A H-24-1253 179 4 08/07/2024
4 12-300-116 A H-24-1253 179 1 08/07/2024
2, 4 12-315-104 (5.5) N H-24-1047 36 2 08/07/2024
2, 4 12-315-104 (6) A H-24-1047 36 2 08/07/2024
2, 4 12-315-104 (10) A H-24-1047 36 2 08/07/2024
2, 4 12-315-104 (10.5) A H-24-1047 36 2 08/07/2024
2, 4 12-315-104 (13) A H-24-1047 36 2 08/07/2024
2, 4 12-315-104 (16.3) N H-24-1047 36 2 08/07/2024
2, 4 12-315-104 (16.5) N H-24-1047 36 2 08/07/2024
4 12-315-104 (19) A H-24-1048 110 1 08/07/2024
2, 4 12-315-104 (21) A H-24-1047 36 2 08/07/2024
2, 4 12-315-104 (21.5) A H-24-1047 36 2 08/07/2024
2, 4 12-315-104 (26) N H-24-1047 36 2 08/07/2024
2, 4 12-315-105 IP(1) A H-24-1047 36 3 08/07/2024
2, 4 12-315-105 (1)(j) A H-24-1047 36 3 08/07/2024
2, 4 12-315-105 (1)(r) N H-24-1047 36 3 08/07/2024
2, 4 12-315-105 (1)(s) N H-24-1047 36 3 08/07/2024
2, 4 12-315-105 (1)(t) N H-24-1047 36 3 08/07/2024
2, 4 12-315-105 (2)(a) A H-24-1047 36 3 08/07/2024
2, 4 12-315-105.5 N H-24-1047 36 4 08/07/2024
2, 4 12-315-106 (5)(a) A H-24-1047 36 5 08/07/2024
2, 4 12-315-106 (5)(b) A H-24-1047 36 5 08/07/2024
4 12-315-106 (9) N H-24-1048 110 2 08/07/2024
2, 4 12-315-110 (3)(a)(II) A H-24-1047 36 6 08/07/2024
2, 4 12-315-112 (1)(ee) A H-24-1047 36 7 08/07/2024
  12-315-126 R S-24-047 440 6 06/06/2024
2, 4 12-315-201 IP(1) A H-24-1047 36 8 08/07/2024
2, 4 12-315-201 (1)(c) N H-24-1047 36 8 08/07/2024
2, 4 12-315-201 (1)(d) N H-24-1047 36 8 08/07/2024
2, 4 12-315-201 (1.5) N H-24-1047 36 8 08/07/2024
2, 4 12-315-201 (2) A H-24-1047 36 8 08/07/2024
2, 4 12-315-203 (4.5) N H-24-1047 36 9 08/07/2024
2, 4 12-315-204 A H-24-1047 36 10 08/07/2024
2, 4 12-315-206 (3) A H-24-1047 36 11 08/07/2024
2, 4 12-315-207 IP(1) A H-24-1047 36 12 08/07/2024
2, 4 12-315-207 (1)(e) A H-24-1047 36 12 08/07/2024
2, 4 12-315-207 (1)(n) A H-24-1047 36 12 08/07/2024
2, 4 12-315-209 A H-24-1047 36 13 08/07/2024
2, 4 12-315-210 A H-24-1047 36 14 08/07/2024
4 12-315-3 (entire part 3) N H-24-1048 110 3 08/07/2024
TITLE 13            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
2 13-1-141 N S-24-187 304 2 05/31/2024
29 13-1-142 N H-24-1445 353 1 09/01/2024
4 13-1-306 A H-24-1275 396 1 08/07/2024
2, 4 13-3-101 (3.5) N H-24-1350 344 8 08/07/2024
15 13-3-117 (3)(b)(II) A H-24-1133 384 8 07/01/2025
15 13-3-117 (5) N H-24-1133 384 8 07/01/2025
2 13-4-112 (3) N H-24-1286 339 3 06/03/2024
  13-5-123.2 (1.5) N H-24-1455 256 3 05/24/2024
  13-5-123.2 (3) A H-24-1455 256 1 05/24/2024
4 13-5.5-105 (2)(d)(I) A H-24-1222 155 1 08/07/2024
2 13-5.7-2 (entire part 2) N H-24-1286 339 2 06/03/2024
3 13-6-105 (1)(f)(I) A S-24-094 158 13 05/03/2024
2, 15 13-10-114.5 (3)(c)(I) A H-24-1437 465 2 07/01/2025
2, 15 13-10-114.5 (3)(c)(III) N H-24-1437 465 2 07/01/2025
  13-14-100.2 (2) A H-24-1122 330 1 01/01/2025
  13-14-100.2 (3) A H-24-1122 330 1 01/01/2025
  13-14-100.2 (4) A H-24-1122 330 1 01/01/2025
  13-14-101 (1.6) N H-24-1122 330 2 01/01/2025
  13-14-101 IP(2) A H-24-1122 330 2 01/01/2025
  13-14-101 (2.1) N H-24-1122 330 2 01/01/2025
  13-14-101 IP(2.4)(a) A H-24-1122 330 2 01/01/2025
  13-14-101 (2.9) A H-24-1122 330 2 01/01/2025
  13-14-103 (1)(e) A H-24-1122 330 3 01/01/2025
  13-14-103 (2)(a) A H-24-1122 330 3 01/01/2025
  13-14-104.5 IP(1)(a) A H-24-1122 330 4 01/01/2025
  13-14-104.5 (1)(a)(IV) A H-24-1122 330 4 01/01/2025
  13-14-104.5 (3) A H-24-1122 330 4 01/01/2025
4 13-14-104.5 (6) A H-24-1291 131 2 08/07/2024
  13-14-104.5 (7) A H-24-1122 330 4 01/01/2025
  13-14-104.5 (8) A H-24-1122 330 4 01/01/2025
  13-14-104.5 (9) A H-24-1122 330 4 01/01/2025
  13-14-104.5 (10) A H-24-1122 330 4 01/01/2025
  13-14-105 (1)(e) R H-24-1122 330 5 01/01/2025
  13-14-105 (1.5) N H-24-1122 330 5 01/01/2025
  13-14-105 (3) N H-24-1122 330 5 01/01/2025
  13-14-105 (4) N H-24-1122 330 5 01/01/2025
  13-14-105.5 IP(1) A H-24-1122 330 6 01/01/2025
  13-14-106 (1)(a) A H-24-1122 330 7 01/01/2025
  13-14-108 (1) A H-24-1122 330 8 01/01/2025
  13-14-108 (2)(b) A H-24-1122 330 8 01/01/2025
4 13-14-108 (3)(a)(II) A H-24-1291 131 3 08/07/2024
  13-14-108 (5) A H-24-1122 330 8 01/01/2025
  13-14-109 (1) A H-24-1122 330 9 01/01/2025
  13-14-109 (2) A H-24-1122 330 9 01/01/2025
  13-14-111 N H-24-1122 330 10 01/01/2025
  13-15-101 IP(3) A H-24-1071 111 1 04/19/2024
  13-15-101 (3)(b) A H-24-1071 111 1 04/19/2024
  13-15-102 (4) A H-24-1071 111 2 04/19/2024
4 13-17-101 A H-24-1291 131 4 08/07/2024
4 13-17-102 (1.5) N H-24-1291 131 5 08/07/2024
4 13-17-102 (2.1) A H-24-1291 131 5 08/07/2024
4 13-17-102 (2.5) N H-24-1291 131 5 08/07/2024
4 13-17-102 (3) A H-24-1291 131 5 08/07/2024
4 13-17-102 (4) A H-24-1291 131 5 08/07/2024
4 13-17-102 (5) A H-24-1291 131 5 08/07/2024
4 13-17-102 (6) A H-24-1291 131 5 08/07/2024
4 13-17-102 (7) A H-24-1291 131 5 08/07/2024
4 13-17-102 (9) N H-24-1291 131 5 08/07/2024
4 13-17-103 IP(1) A H-24-1291 131 6 08/07/2024
4 13-17-104 A H-24-1291 131 7 08/07/2024
4 13-17-105 A H-24-1291 131 8 08/07/2024
4 13-17-106 A H-24-1291 131 9 08/07/2024
150 13-20-403 A H-24-1471 360 1 06/03/2024
2, 3, 4 13-20-13 (entire part 13) N S-24-011 402 4 08/07/2024
2 13-21-102.5 (2)(a.5) N H-24-1472 325 2 01/01/2025
2 13-21-102.5 (3)(a) A H-24-1472 325 2 01/01/2025
2 13-21-102.5 (3)(b) A H-24-1472 325 2 01/01/2025
2 13-21-102.5 (3)(c)(I) A H-24-1472 325 2 01/01/2025
2 13-21-102.5 (3)(c)(II) R H-24-1472 325 2 01/01/2025
2 13-21-102.5 IP(3)(c)(III) A H-24-1472 325 2 01/01/2025
2 13-21-102.5 (3)(c)(III.5) N H-24-1472 325 2 01/01/2025
  13-21-108.7 (1) A H-24-1037 458 2 06/06/2024
  13-21-108.7 (2)(a) R H-24-1037 458 2 06/06/2024
  13-21-108.7 (2)(c) A H-24-1037 458 2 06/06/2024
  13-21-108.7 (2)(d) A H-24-1037 458 2 06/06/2024
  13-21-108.7 IP(2)(e) A H-24-1037 458 2 06/06/2024
  13-21-108.7 (2)(e)(II) A H-24-1037 458 2 06/06/2024
  13-21-108.7 (3)(a) A H-24-1037 458 2 06/06/2024
2, 4 13-21-108.7 (3)(b)(I) A H-24-1003 121 6 08/07/2024
  13-21-108.7 (3)(b)(II) A H-24-1037 458 2 06/06/2024
  13-21-108.7 (4)(a) A H-24-1037 458 2 06/06/2024
  13-21-108.7 (5) A H-24-1037 458 2 06/06/2024
2, 4 13-21-108.8 A H-24-1003 121 7 08/07/2024
2 13-21-115.5 (4.5) N H-24-1309 156 2 05/03/2024
2 13-21-201 (1)(a)(III) A H-24-1472 325 3 01/01/2025
2 13-21-201 (1)(a)(IV) A H-24-1472 325 3 01/01/2025
2 13-21-201 (1)(a)(V) N H-24-1472 325 3 01/01/2025
2 13-21-201 (1)(b)(I)(C) A H-24-1472 325 3 01/01/2025
2 13-21-201 (1)(b)(I)(D) A H-24-1472 325 3 01/01/2025
2 13-21-201 (1)(b)(I)(E) N H-24-1472 325 3 01/01/2025
2 13-21-203 (1) A H-24-1472 325 4 01/01/2025
2 13-21-203.7 (1) A H-24-1472 325 5 01/01/2025
2 13-21-203.7 (1.5) N H-24-1472 325 5 01/01/2025
2 13-21-203.7 (2) A H-24-1472 325 5 01/01/2025
2 13-21-203.7 (4) N H-24-1472 325 5 01/01/2025
34 13-32-101 IP(1)(c)(III.5) A H-24-1099 379 1 11/01/2024
34 13-32-101 (1)(c)(V) N H-24-1099 379 1 11/01/2024
2 13-32-101 (9) N H-24-1286 339 4 06/03/2024
2 13-32-102 (7) N H-24-1286 339 5 06/03/2024
2, 121 13-32-114 (4) A H-24-1466 429 13 06/05/2024
121 13-32-114 (4) A H-24-1465 257 2 05/24/2024
2 13-40-104 IP(1) A H-24-1098 113 3 04/19/2024
2 13-40-104 (1)(c) A H-24-1098 113 3 04/19/2024
2 13-40-104 (1)(e) A H-24-1098 113 3 04/19/2024
2 13-40-104 (1)(e.5)(II) A H-24-1098 113 3 04/19/2024
2 13-40-104 (1)(e.8) N H-24-1098 113 3 04/19/2024
2 13-40-104 (1)(j) N H-24-1098 113 3 04/19/2024
2 13-40-106 A H-24-1098 113 4 04/19/2024
2 13-40-107 A H-24-1098 113 5 04/19/2024
2 13-40-107.5 (4)(a) A H-24-1098 113 6 04/19/2024
2 13-40-107.5 (4)(b) A H-24-1098 113 6 04/19/2024
2 13-40-108 A H-24-1098 113 7 04/19/2024
  13-40-110 IP(1)(a) A S-24-064 297 2 05/31/2024
  13-40-110 (1)(f) N S-24-064 297 2 05/31/2024
2 13-40-110 (2) A H-24-1098 113 8 04/19/2024
3, 40 13-40-111 (1) A S-24-094 158 14 05/03/2024
34, 40 13-40-111 (1) A H-24-1099 379 3 11/01/2024
34 13-40-113.5 (1)(b) A H-24-1099 379 2 11/01/2024
34 13-40-113.5 (1)(c) A H-24-1099 379 2 11/01/2024
34 13-40-113.5 (1)(d) A H-24-1099 379 2 11/01/2024
34 13-40-113.5 (1)(e) N H-24-1099 379 2 11/01/2024
  13-40-128 N S-24-064 297 1 05/31/2024
  13-51.5-102 (1.5) N H-24-1107 285 1 05/30/2024
  13-51.5-104 N H-24-1107 285 2 05/30/2024
2 13-64-302 (1)(b) A H-24-1472 325 6 01/01/2025
2 13-64-302 (1)(c) A H-24-1472 325 6 01/01/2025
2, 4 13-80-103.6 (1) A H-24-1350 344 10 08/07/2024
4 13-90-107 (1)(b) A H-24-1291 131 10 08/07/2024
4 13-90-107 (1)(m) A S-24-063 31 1 08/07/2024
4 13-91-103 (3) A H-24-1377 254 1 08/07/2024
4 13-91-104 IP(3) A H-24-1102 63 1 08/07/2024
4 13-91-104 (3)(a)(II) A H-24-1102 63 1 08/07/2024
2 13-91-105 (3) N H-24-1374 181 2 05/15/2024
4 13-92-103 (4)(a) A H-24-1102 63 2 08/07/2024
2 13-92-104 (3) N H-24-1374 181 3 05/15/2024
4 13-93-3 (entire part 3) N H-24-1291 131 1 08/07/2024
4 13-95-101 (4) A H-24-1355 471 2 08/07/2024
4 13-95-102 (2.5) N H-24-1355 471 3 08/07/2024
4 13-95-102 (2.6) N H-24-1355 471 3 08/07/2024
4 13-95-102 (2.7) N H-24-1355 471 3 08/07/2024
4 13-95-102 (2.8) N H-24-1355 471 3 08/07/2024
4 13-95-102 (4) A H-24-1355 471 3 08/07/2024
4 13-95-102 (5) R H-24-1355 471 3 08/07/2024
4 13-95-102 (8) A H-24-1355 471 3 08/07/2024
4 13-95-102 (9) A H-24-1355 471 3 08/07/2024
4 13-95-102 (10) R H-24-1355 471 3 08/07/2024
4 13-95-103 (1)(a) A H-24-1355 471 4 08/07/2024
4 13-95-103 (1)(b) A H-24-1355 471 4 08/07/2024
4 13-95-103 (1)(c)(II)(A) A H-24-1355 471 4 08/07/2024
4 13-95-103 (2) N H-24-1355 471 4 08/07/2024
4 13-95-103 (4)(a) A H-24-1355 471 4 08/07/2024
4 13-95-103 (5) A H-24-1355 471 4 08/07/2024
4 13-95-104 (1) A H-24-1355 471 5 08/07/2024
4 13-95-104 (2)(a)(VI) A H-24-1355 471 5 08/07/2024
4 13-95-104 (2)(c) A H-24-1355 471 5 08/07/2024
4 13-95-104 (5)(b) A H-24-1355 471 5 08/07/2024
4 13-95-105 A H-24-1355 471 6 08/07/2024
4 13-95-106 A H-24-1355 471 7 08/07/2024
4 13-95-107 (2) A H-24-1355 471 8 08/07/2024
4 13-95-109 (1) A H-24-1355 471 9 08/07/2024
  13-100- (entire article 100) RE S-24-217 308 1 05/31/2024
TITLE 14            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
  14-7-103 A S-24-135 34 3 03/22/2024
4 14-10-108 (1) A H-24-1291 131 11 08/07/2024
4 14-10-108 (7) A H-24-1291 131 11 08/07/2024
4 14-10-114 (7)(b) A H-24-1291 131 12 08/07/2024
4 14-10-116 (2.5)(a) A H-24-1291 131 13 08/07/2024
2, 4 14-10-116.5 (2)(b) A H-24-1350 344 2 08/07/2024
2, 4 14-10-116.5 (2)(b.3) N H-24-1350 344 2 08/07/2024
2, 4 14-10-116.5 (2)(b.7) N H-24-1350 344 2 08/07/2024
2, 4 14-10-116.5 (2)(f) A H-24-1350 344 2 08/07/2024
4 14-10-116.5 (2.5)(a) A H-24-1291 131 14 08/07/2024
2, 4 14-10-116.5 (2.7) N H-24-1350 344 2 08/07/2024
2, 4 14-10-116.5 (5) N H-24-1350 344 2 08/07/2024
4 14-10-119 A H-24-1291 131 15 08/07/2024
4 14-10-120.3 (1)(a) A H-24-1291 131 16 08/07/2024
4 14-10-122 IP(1.5)(f)(I) A H-24-1291 131 17 08/07/2024
4 14-10-122 (1.5)(f)(I)(J) A H-24-1291 131 17 08/07/2024
4 14-10-123 IP(1.5)(c) A S-24-119 33 1 08/07/2024
4 14-10-123 (1.5)(c)(II) A S-24-119 33 1 08/07/2024
2, 4 14-10-124 (1.3) A H-24-1350 344 3 08/07/2024
2, 4 14-10-124 (1.5)(a.5) N H-24-1350 344 3 08/07/2024
2, 4 14-10-124 IP(4)(e) A H-24-1350 344 3 08/07/2024
2, 4 14-10-124 (9) N H-24-1350 344 3 08/07/2024
4 14-10-124.4 (4) A H-24-1450 490 20 08/07/2024
4, 27 14-10-126 A H-24-1291 131 18 08/07/2024
2, 4, 27 14-10-126 A H-24-1350 344 4 08/07/2024
2, 4 14-10-127 (1)(a)(I)(A) A H-24-1350 344 5 08/07/2024
4 14-10-127 (1.2)(a) A H-24-1291 131 19 08/07/2024
2, 4 14-10-127 (1.5) N H-24-1350 344 5 08/07/2024
4 14-10-127 (3) A H-24-1291 131 19 08/07/2024
2, 4 14-10-127 IP(4) A H-24-1350 344 5 08/07/2024
2, 4 14-10-127 (4)(a.5) A H-24-1350 344 5 08/07/2024
2, 4 14-10-127 (7)(b.3) N H-24-1350 344 5 08/07/2024
2, 4 14-10-127 (7)(b.7) N H-24-1350 344 5 08/07/2024
2, 4 14-10-127 (11) N H-24-1350 344 5 08/07/2024
2, 4 14-10-127.5 (2)(a.3) N H-24-1350 344 6 08/07/2024
2, 4 14-10-127.5 (3)(a)(I) A H-24-1350 344 6 08/07/2024
2, 4 14-10-127.5 (3)(a)(II)(D) A H-24-1350 344 6 08/07/2024
2, 4 14-10-127.5 (3)(a)(III) N H-24-1350 344 6 08/07/2024
2, 4 14-10-127.5 (3.5) N H-24-1350 344 6 08/07/2024
4 14-10-127.5 IP(5)(a) A H-24-1450 490 21 08/07/2024
2, 4 14-10-127.5 (5)(b)(IX) N H-24-1350 344 6 08/07/2024
2, 4 14-10-127.5 (5)(b)(X) N H-24-1350 344 6 08/07/2024
2, 4 14-10-127.5 (5)(b.1) N H-24-1350 344 6 08/07/2024
2, 4 14-10-127.5 (5)(b.5) N H-24-1350 344 6 08/07/2024
2, 4 14-10-127.5 (6)(c)(I) A H-24-1350 344 6 08/07/2024
2, 4 14-10-127.5 (6)(d) N H-24-1350 344 6 08/07/2024
2, 4 14-10-128.1 (2)(b) A H-24-1350 344 7 08/07/2024
4 14-10-128.1 (2.5)(a) A H-24-1291 131 20 08/07/2024
4 14-10-128.1 (7)(d) A H-24-1291 131 20 08/07/2024
4 14-10-128.3 (3) A H-24-1291 131 21 08/07/2024
4 14-10-128.3 (4.5)(a) A H-24-1291 131 21 08/07/2024
4 14-10-128.3 (7)(d) A H-24-1291 131 21 08/07/2024
4 14-10-129 (2.5)(b) A H-24-1291 131 22 08/07/2024
4 14-10-129 (3)(a) A H-24-1291 131 22 08/07/2024
4 14-10-129 (5) A H-24-1291 131 22 08/07/2024
4 14-10-129.5 (4) A H-24-1291 131 23 08/07/2024
TITLE 15            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
4 15-14-204 IP(2.5)(c) A S-24-119 33 2 08/07/2024
4 15-14-204 (2.5)(c)(II) A S-24-119 33 2 08/07/2024
11 15-24- (entire article 24) N H-24-1248 154 1 01/01/2025
TITLE 16            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
  16-1-104 (8.5)(a)(I) A S-24-035 54 1 04/11/2024
2 16-2.5-152 A S-24-187 304 3 05/31/2024
10 16-4-101 (1)(c) A H-24-1225 130 1  
10 16-4-101 (1)(d) N H-24-1225 130 1  
10 16-4-101 (3) A H-24-1225 130 1  
10 16-4-101 (4) A H-24-1225 130 1  
  16-4-113 (2)(a) A H-24-1241 66 1 04/11/2024
  16-5-401 (6) A S-24-035 54 5 04/11/2024
  16-5-401 IP(8)(a) A S-24-035 54 5 04/11/2024
  16-5-401 IP(8)(a.3) A S-24-035 54 5 04/11/2024
  16-5-401 IP(8)(a.5) A S-24-035 54 5 04/11/2024
  16-5-401 (8)(a.7)(I) A S-24-035 54 5 04/11/2024
  16-5-401 (8)(a.7)(II) A S-24-035 54 5 04/11/2024
  16-8.5-102 (1) A H-24-1034 372 1 06/04/2024
  16-8.5-102 (2)(a) A H-24-1034 372 1 06/04/2024
  16-8.5-102 (2)(b) A H-24-1034 372 1 06/04/2024
  16-8.5-102 (2)(d) A H-24-1034 372 1 06/04/2024
  16-8.5-102 (3) A H-24-1034 372 1 06/04/2024
4 16-8.5-102 (4) N H-24-1355 471 10 08/07/2024
  16-8.5-103 (1)(b) A H-24-1034 372 2 06/04/2024
  16-8.5-103 (8) A H-24-1034 372 2 06/04/2024
  16-8.5-104 IP(1) A H-24-1034 372 3 06/04/2024
  16-8.5-104 (3) A H-24-1034 372 3 06/04/2024
  16-8.5-104 (4) A H-24-1034 372 3 06/04/2024
  16-8.5-104 (4.5) N H-24-1034 372 3 06/04/2024
  16-8.5-104 (6) A H-24-1034 372 3 06/04/2024
  16-8.5-105 (1)(a)(I) A H-24-1034 372 4 06/04/2024
  16-8.5-105 (1)(a)(III) A H-24-1034 372 4 06/04/2024
  16-8.5-105 (1)(b.6) N H-24-1034 372 4 06/04/2024
  16-8.5-105 (1)(b.7) A H-24-1034 372 4 06/04/2024
  16-8.5-105 (1)(d) A H-24-1034 372 4 06/04/2024
4, 16, 138 16-8.5-105 (4) A H-24-1450 490 22 08/07/2024
16, 138 16-8.5-105 (4) A H-24-1034 372 4 06/04/2024
  16-8.5-105 IP(5) A H-24-1034 372 4 06/04/2024
  16-8.5-105 (5)(d) A H-24-1034 372 4 06/04/2024
  16-8.5-105 (5)(e) A H-24-1034 372 4 06/04/2024
  16-8.5-105 (5)(f) A H-24-1034 372 4 06/04/2024
16 16-8.5-105 (5)(h)(II) A H-24-1034 372 4 06/04/2024
  16-8.5-105 (6) A H-24-1034 372 4 06/04/2024
  16-8.5-107 A H-24-1034 372 5 06/04/2024
  16-8.5-108 (1)(c) A H-24-1034 372 6 06/04/2024
  16-8.5-108 (2) A H-24-1034 372 6 06/04/2024
  16-8.5-109 (1) A H-24-1034 372 7 06/04/2024
  16-8.5-109 (2)(b) A H-24-1034 372 7 06/04/2024
  16-8.5-109 (3) A H-24-1034 372 7 06/04/2024
  16-8.5-110 A H-24-1034 372 8 06/04/2024
60 16-8.5-111 RE H-24-1034 372 9 07/01/2024
62 16-8.5-111 (1.5) N H-24-1355 471 12 08/07/2024
62 16-8.5-111 (1.6) N H-24-1355 471 12 08/07/2024
61 16-8.5-111 (4) N H-24-1355 471 11  
  16-8.5-112 (1) A H-24-1034 372 10 06/04/2024
  16-8.5-112 (2) A H-24-1034 372 10 06/04/2024
  16-8.5-112 (3) A H-24-1034 372 10 06/04/2024
  16-8.5-113 (1) A H-24-1034 372 11 06/04/2024
  16-8.5-113 (2) A H-24-1034 372 11 06/04/2024
  16-8.5-113 (5) A H-24-1034 372 11 06/04/2024
  16-8.5-113 (6) A H-24-1034 372 11 06/04/2024
63 16-8.5-116 (1) A H-24-1355 471 13 08/07/2024
  16-8.5-116 (1) R H-24-1034 372 12 06/04/2024
  16-8.5-116 IP(2)(b) A H-24-1034 372 12 06/04/2024
  16-8.5-116 IP(2)(c) A H-24-1034 372 12 06/04/2024
  16-8.5-116 (2)(c)(V) A H-24-1034 372 12 06/04/2024
  16-8.5-116 (2)(c)(VI) A H-24-1034 372 12 06/04/2024
  16-8.5-116 (2)(c)(VII) N H-24-1034 372 12 06/04/2024
  16-8.5-116 (3) A H-24-1034 372 12 06/04/2024
  16-8.5-116 (4) R H-24-1034 372 12 06/04/2024
  16-8.5-116 (5) A H-24-1034 372 12 06/04/2024
68 16-8.5-116 IP(6) R H-24-1034 372 18 06/04/2024
68 16-8.5-116 (6)(a) R H-24-1034 372 18 06/04/2024
16, 68 16-8.5-116 (6)(b) R H-24-1034 372 18 06/04/2024
68 16-8.5-116 (6)(c) R H-24-1034 372 18 06/04/2024
68 16-8.5-116 (6)(d) R H-24-1034 372 18 06/04/2024
4, 135 16-8.5-116 (7) A H-24-1355 471 13 08/07/2024
68, 135 16-8.5-116 (7) R H-24-1034 372 18 06/04/2024
68 16-8.5-116 (8) R H-24-1034 372 18 06/04/2024
68 16-8.5-116 (9) R H-24-1034 372 18 06/04/2024
16, 68 16-8.5-116 (10) R H-24-1034 372 18 06/04/2024
68 16-8.5-116 (11) R H-24-1034 372 18 06/04/2024
68 16-8.5-116 (12) R H-24-1034 372 18 06/04/2024
15, 136 16-8.5-116 (12) R H-24-1133 384 9 07/01/2025
68 16-8.5-116 (13) R H-24-1034 372 18 06/04/2024
4, 137 16-8.5-116 (14) A H-24-1355 471 13 08/07/2024
68, 137 16-8.5-116 (14) R H-24-1034 372 18 06/04/2024
68 16-8.5-116 (15) R H-24-1034 372 18 06/04/2024
67 16-8.5-116.5 N H-24-1034 372 13 06/04/2024
  16-8.5-117 A H-24-1034 372 14 06/04/2024
  16-8.5-118 A H-24-1034 372 15 06/04/2024
4 16-8.5-124 N H-24-1355 471 14 08/07/2024
4 16-8.6- (entire article 8.6) N H-24-1355 471 1 08/07/2024
10 16-10-104 (1) A H-24-1225 130 2  
  16-11-101.6 (7) N H-24-1213 9 1 02/27/2024
29 16-11-209 (1.3) N H-24-1445 353 2 09/01/2024
4 16-11.7-102 (1) A H-24-1450 490 23 08/07/2024
TITLE 17            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
  17-1-113.7 (1) A H-24-1459 426 1 06/05/2024
  17-1-113.7 (2)(a) R H-24-1459 426 1 06/05/2024
  17-1-114.5 (1)(f.5) N H-24-1459 426 3 06/05/2024
  17-1-115.8 IP(3) A H-24-1228 265 1 05/28/2024
  17-1-115.8 (3)(b) A H-24-1228 265 1 05/28/2024
  17-1-168 N H-24-1386 91 1 04/18/2024
29 17-2-201 (4.5) N H-24-1445 353 3 09/01/2024
29 17-2-201 (5)(b) A H-24-1445 353 3 09/01/2024
29 17-2-201 IP(5)(f)(I) A H-24-1445 353 3 09/01/2024
29 17-2-201 (5)(f)(I)(D) A H-24-1445 353 3 09/01/2024
29 17-2-201 (5)(f)(I)(D.5) N H-24-1445 353 3 09/01/2024
3, 4 17-22.5-405 (3.7)(c) N H-24-1461 427 1 08/07/2024
3, 4 17-22.5-405 (4)(a) A H-24-1461 427 1 08/07/2024
  17-26-104.4 (1)(g.5) N H-24-1459 426 4 06/05/2024
15 17-26-104.5 IP(1.3) A H-24-1399 76 11 07/01/2025
  17-26-104.7 (1) A H-24-1459 426 2 06/05/2024
  17-26-104.7 (2)(a) R H-24-1459 426 2 06/05/2024
  17-26-140 (1)(c) A H-24-1037 458 15 06/06/2024
4 17-26-140 (2) A H-24-1222 155 2 08/07/2024
  17-26-140 (3) A H-24-1037 458 15 06/06/2024
4 17-42-105 (2)(b) A H-24-1222 155 3 08/07/2024
4 17-42-105 (4) A H-24-1222 155 3 08/07/2024
4 17-42-105 (5)(a) A H-24-1222 155 3 08/07/2024
TITLE 18            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
  18-1-410.7 N H-24-1345 317 10 05/31/2024
  18-1-707 (2.7) N H-24-1372 348 1 06/03/2024
  18-1-712 (1) A H-24-1037 458 3 06/06/2024
  18-1-712 (2)(a) A H-24-1037 458 3 06/06/2024
2, 4 18-1-712 (2)(b)(I) A H-24-1003 121 8 08/07/2024
  18-1-712 (2)(b)(II) A H-24-1037 458 3 06/06/2024
  18-1-712 (3)(a) A H-24-1037 458 3 06/06/2024
  18-1-712 (4) A H-24-1037 458 3 06/06/2024
  18-1-712 (5)(a) R H-24-1037 458 3 06/06/2024
  18-1-712 (5)(c) A H-24-1037 458 3 06/06/2024
  18-1-712 (5)(d) A H-24-1037 458 3 06/06/2024
  18-1-712 IP(5)(e) A H-24-1037 458 3 06/06/2024
  18-1-712 (5)(e)(II) A H-24-1037 458 3 06/06/2024
  18-1-712.3 N H-24-1037 458 4 06/06/2024
3 18-1-901 (3)(r.5) N S-24-189 305 3 07/01/2024
  18-1.3-101 (9)(g) N S-24-006 30 2 03/22/2024
  18-1.3-101 (11) A H-24-1465 257 3 05/24/2024
29 18-1.3-204 IP(2)(a) A H-24-1445 353 4 09/01/2024
29 18-1.3-204 (2)(a)(V) A H-24-1445 353 4 09/01/2024
29 18-1.3-204 (2)(a)(IX) A H-24-1445 353 4 09/01/2024
  18-1.3-406 IP(2)(a)(II) A S-24-035 54 2 04/11/2024
  18-1.3-406 (2)(a)(II)(J) A S-24-035 54 2 04/11/2024
  18-1.3-406 (2)(a)(II)(L) N S-24-035 54 2 04/11/2024
  18-1.3-406 (2)(a)(II)(M) N S-24-035 54 2 04/11/2024
  18-1.3-410 (4) A H-24-1037 458 16 06/06/2024
  18-1.3-510 (4) A H-24-1037 458 17 06/06/2024
2, 3 18-3-407 (1) A H-24-1072 123 2 07/01/2024
2, 3 18-3-407 IP(2) A H-24-1072 123 2 07/01/2024
2, 3 18-3-407 (2)(a) A H-24-1072 123 2 07/01/2024
2, 3 18-3-407 (2)(e) A H-24-1072 123 2 07/01/2024
2, 3 18-3-407 (4) N H-24-1072 123 2 07/01/2024
  18-3-503 (3) N S-24-035 54 3 04/11/2024
  18-3-504 (2.5) A S-24-035 54 4 04/11/2024
  18-3-505 (3)(a) A H-24-1345 317 3 05/31/2024
  18-3-505 (6) A H-24-1345 317 2 05/31/2024
  18-4-511 (4)(b) A H-24-1449 192 3 07/01/2024
  18-6-803.9 R S-24-135 34 4 03/22/2024
2, 3, 4 18-7-107 IP(1)(a) A S-24-011 402 5 08/07/2024
2, 3, 4 18-7-107 (2.5) N S-24-011 402 5 08/07/2024
2, 3, 4 18-7-108 IP(1)(a) A S-24-011 402 6 08/07/2024
2, 3, 4 18-7-108 (2.5) N S-24-011 402 6 08/07/2024
2, 3, 4 18-7-109 IP(8) A S-24-011 402 7 08/07/2024
2, 3, 4 18-7-109 (8)(b) A S-24-011 402 7 08/07/2024
4 18-8-118 N S-24-108 148 1 08/07/2024
  18-8-802 (1)(a) A H-24-1074 69 3 04/17/2024
  18-8-802 (1.5)(a) A H-24-1074 69 3 04/17/2024
3 18-9-111 (2)(a) A S-24-189 305 2 07/01/2024
3 18-9-121 (1) A S-24-189 305 1 07/01/2024
3 18-9-121 IP(2) A S-24-189 305 1 07/01/2024
3 18-9-121 (5)(b) A S-24-189 305 1 07/01/2024
  18-9-201 (2.8) N H-24-1074 69 1 04/17/2024
  18-9-202 (1.5) A H-24-1074 69 2 04/17/2024
  18-9-202 (1.8) A H-24-1074 69 2 04/17/2024
  18-9-202 (2)(a) A H-24-1074 69 2 04/17/2024
  18-9-202 (2)(a.5)(V)(B) A H-24-1074 69 2 04/17/2024
  18-9-202 (2)(c) A H-24-1074 69 2 04/17/2024
  18-9-202 (2)(d)(II) A H-24-1074 69 2 04/17/2024
  18-9-202 (2.5) A H-24-1074 69 2 04/17/2024
4 18-9-204.5 (2)(a.5) A H-24-1458 288 6 08/07/2024
4 18-9-313 (1)(c.5) N H-24-1104 64 1 08/07/2024
4 18-9-313 (1)(n) A H-24-1104 64 1 08/07/2024
2, 3 18-12-105 IP(1) A S-24-131 301 5 07/01/2024
2, 3 18-12-105 (1)(c) A S-24-131 301 5 07/01/2024
2, 3 18-12-105 IP(2) A S-24-131 301 5 07/01/2024
2, 3 18-12-105 (2)(b.5) N S-24-131 301 5 07/01/2024
2, 3 18-12-105.3 N S-24-131 301 2 07/01/2024
2, 3 18-12-105.5 (1)(a) A S-24-131 301 3 07/01/2024
2, 3 18-12-105.5 (1)(a.5) N S-24-131 301 3 07/01/2024
2, 3 18-12-105.5 (1)(b)(II) A S-24-131 301 3 07/01/2024
2, 3 18-12-105.5 IP(3) A S-24-131 301 3 07/01/2024
2, 3 18-12-105.5 (3)(d) R S-24-131 301 3 07/01/2024
2, 3 18-12-105.5 (3)(d.5) A S-24-131 301 3 07/01/2024
2, 3 18-12-105.5 (3)(h) A S-24-131 301 3 07/01/2024
2, 3 18-12-105.5 (3)(i) N S-24-131 301 3 07/01/2024
2, 3 18-12-105.5 (3)(j) N S-24-131 301 3 07/01/2024
2, 3 18-12-105.5 (4) N S-24-131 301 3 07/01/2024
3 18-12-105.6 (2)(a) A H-24-1348 178 3 01/01/2025
  18-12-111 (3) N H-24-1353 492 5 07/01/2025
3 18-12-113 (5) A H-24-1348 178 2 01/01/2025
3 18-12-114.5 N H-24-1348 178 1 01/01/2025
31 18-12-202 (2) R H-24-1174 388 1 07/01/2025
31 18-12-202 (3.5) N H-24-1174 388 1 07/01/2025
31 18-12-202 (5) R H-24-1174 388 1 07/01/2025
31 18-12-202 (6.5) N H-24-1174 388 1 07/01/2025
31 18-12-202 (8) A H-24-1174 388 1 07/01/2025
31 18-12-202 (9) N H-24-1174 388 1 07/01/2025
31 18-12-202.5 N H-24-1174 388 2 08/07/2024
31 18-12-202.7 N H-24-1174 388 3 08/07/2024
31 18-12-203 (1)(c.5) N H-24-1174 388 4 07/01/2025
31 18-12-203 (1)(h)(I) A H-24-1174 388 4 07/01/2025
31 18-12-203 (1)(h)(VI) A H-24-1174 388 4 07/01/2025
31 18-12-207 (3) A H-24-1174 388 5 08/07/2024
31 18-12-207 (4) N H-24-1174 388 5 08/07/2024
31 18-12-211 (1)(a) A H-24-1174 388 6 07/01/2025
31 18-12-211 (3) N H-24-1174 388 6 07/01/2025
3 18-12-214 (3)(a) A H-24-1348 178 4 01/01/2025
2, 3 18-12-214 (3.5) A S-24-131 301 6 07/01/2024
31 18-12-215 (2) A H-24-1174 388 7 07/01/2025
  18-12-401 A H-24-1353 492 1 06/07/2024
  18-12-401.5 N H-24-1353 492 2 06/07/2024
3 18-12-405 (2) A H-24-1348 178 5 01/01/2025
  18-12-406 N H-24-1353 492 3 07/01/2025
  18-12-407 N H-24-1353 492 4 07/01/2025
4 18-18-401 (1)(e) A H-24-1450 490 24 08/07/2024
  18-18-428 (1)(b)(III) N H-24-1037 458 5 06/06/2024
  18-18-434 (12)(b)(I)(E) A S-24-198 452 4 06/06/2024
  18-19-103 (5)(c)(IX) A H-24-1037 458 18 06/06/2024
  18-19-104 (1.5) N H-24-1212 8 1 02/27/2024
TITLE 19            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
4 19-1-103 (61.5) N H-24-1031 327 1 08/07/2024
4 19-1-103 (92.5) N H-24-1031 327 1 08/07/2024
4 19-1-103 (95.5) N H-24-1031 327 1 08/07/2024
4 19-1-103 (128.5) N S-24-119 33 3 08/07/2024
4 19-1-104 (1.5) A S-24-119 33 4 08/07/2024
  19-1-115 (4)(d)(I) A S-24-202 222 1 05/22/2024
  19-1-115.5 (1)(a)(I) A H-24-1448 236 26 05/23/2024
4 19-1-208 (6) N H-24-1377 254 2 08/07/2024
  19-1-305 (1)(e) A S-24-228 170 7 05/14/2024
  19-1-305 (1)(f) A S-24-228 170 7 05/14/2024
  19-1-305 (1)(g) R S-24-228 170 7 05/14/2024
4 19-1-307 (2)(e.5)(I)(P) A H-24-1222 155 4 08/07/2024
  19-2.5-302 (1.5) N H-24-1212 8 2 02/27/2024
4 19-2.5-303 (2)(f) A H-24-1216 314 2 08/07/2024
4 19-2.5-306 (4)(a.5) N H-24-1216 314 3 08/07/2024
  19-2.5-402 (1)(c)(I.5) N S-24-006 30 1 03/22/2024
  19-2.5-402 (3)(e) A S-24-006 30 1 03/22/2024
  19-2.5-402 (4)(b.5) N S-24-006 30 1 03/22/2024
  19-2.5-402 (4)(c)(III) A S-24-006 30 1 03/22/2024
  19-2.5-402 (4)(c)(IV) A S-24-006 30 1 03/22/2024
  19-2.5-402 (4)(c)(V) N S-24-006 30 1 03/22/2024
  19-2.5-402 (4)(c.5) N S-24-006 30 1 03/22/2024
  19-2.5-402 (4.5)(c) A S-24-006 30 1 03/22/2024
29 19-2.5-1107 (3)(d) N H-24-1445 353 5 09/01/2024
29 19-2.5-1108 (2)(a)(III) A H-24-1445 353 6 09/01/2024
4 19-2.5-1117 (1)(a) A H-24-1216 314 4 08/07/2024
4 19-2.5-1117 (1)(d) N H-24-1216 314 4 08/07/2024
29 19-2.5-1201 (7) A H-24-1445 353 7 09/01/2024
29 19-2.5-1203 (1) A H-24-1445 353 8 09/01/2024
29 19-2.5-1204 (2) A H-24-1445 353 9 09/01/2024
4 19-2.5-1404 (3)(b) A H-24-1450 490 25 08/07/2024
2, 4 19-2.5-1501 (1)(b)(IV) A H-24-1170 386 2 08/07/2024
2, 4 19-2.5-1501 (1)(b)(V) A H-24-1170 386 2 08/07/2024
2, 4 19-2.5-1501 (1)(b)(VI) N H-24-1170 386 2 08/07/2024
  19-2.5-1501 (4) A S-24-030 13 2 03/06/2024
2, 4 19-2.5-1502.5 N H-24-1170 386 3 08/07/2024
4 19-3-100.5 (3) A H-24-1222 155 5 08/07/2024
4 19-3-208 (2)(h) N H-24-1031 327 2 08/07/2024
4 19-3-208 (3)(e) A H-24-1222 155 6 08/07/2024
4 19-3-217 (1.5)(c)(II) A H-24-1450 490 26 08/07/2024
4 19-3-217 (1.5)(e)(II) A H-24-1450 490 26 08/07/2024
  19-3-218 N S-24-008 289 1 09/01/2024
4, 139 19-3-218 N H-24-1031 327 3 08/07/2024
4 19-3-304 (2)(ll) A H-24-1222 155 7 08/07/2024
  19-3-304.5 (6) A S-24-135 34 5 03/22/2024
2 19-3-307 (2)(c.5) N H-24-1046 262 2 05/28/2024
2 19-3-307 (5) N H-24-1046 262 2 05/28/2024
4 19-3-308 (1)(a) A H-24-1222 155 8 08/07/2024
4 19-3-406 (12)(a) A H-24-1450 490 27 08/07/2024
4 19-3-507 (6) N H-24-1031 327 4 08/07/2024
4 19-3-602 IP(1.5)(a) A H-24-1222 155 9 08/07/2024
4 19-3-602 (1.5)(a)(I) A H-24-1222 155 9 08/07/2024
  19-3-702 IP(3) A S-24-008 289 2 09/01/2024
4 19-3.1-101 (3) A S-24-119 33 5 08/07/2024
4 19-4-105 (1)(f) A H-24-1450 490 28 08/07/2024
4 19-4-106 (2) A H-24-1450 490 29 08/07/2024
4 19-4-120 A H-24-1291 131 24 08/07/2024
4 19-6-103 (1) A H-24-1291 131 25 08/07/2024
4 19-7-101 RE H-24-1017 122 1 08/07/2024
4 19-7-102 (1) A H-24-1017 122 2 08/07/2024
  19-7-104 (4) N S-24-008 289 3 09/01/2024
4 19-7-304 (1)(c)(I)(B) A H-24-1450 490 30 08/07/2024
4 19-7-305 (1)(b)(II) A S-24-191 221 2 08/07/2024
4 19-7-309.5 (5) A S-24-119 33 6 08/07/2024
TITLE 20            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
4 20-1-203 A S-24-013 403 1 08/07/2024
4 20-1-205 (3) A S-24-013 403 2 08/07/2024
4 20-1-301 (1)(a)(VI) N S-24-013 403 3 08/07/2024
4 20-1-301 (1)(c) R S-24-013 403 3 08/07/2024
4 20-1-306 A S-24-013 403 4 08/07/2024
TITLE 21            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
4 21-2-102 (1) A H-24-1102 63 3 08/07/2024
2 21-2-105 (3) N H-24-1374 181 4 05/15/2024
TITLE 22            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
12 22-1-119.1 (1) A H-24-1037 458 19 06/06/2024
2, 4, 12 22-1-119.1 (1)(a) A H-24-1003 121 2 08/07/2024
2, 4, 12 22-1-119.1 (1)(b) A H-24-1003 121 2 08/07/2024
2, 4 22-1-119.1 (1)(c) N H-24-1003 121 2 08/07/2024
2, 4 22-1-119.1 (2) A H-24-1003 121 2 08/07/2024
  22-1-119.1 (3)(a) A H-24-1037 458 19 06/06/2024
  22-1-119.1 IP(3)(b) A H-24-1037 458 19 06/06/2024
  22-1-119.1 (3)(b)(II) A H-24-1037 458 19 06/06/2024
2, 4 22-1-119.1 (4) N H-24-1003 121 2 08/07/2024
2, 4 22-1-119.2 A H-24-1003 121 3 08/07/2024
2, 4 22-1-119.7 N H-24-1003 121 4 08/07/2024
  22-1-122 (6)(b) A H-24-1448 236 27 05/23/2024
4 22-1-135 (2)(d)(II)(B) A H-24-1450 490 31 08/07/2024
  22-1-142.5 N H-24-1323 419 1 06/05/2024
  22-1-143 (1)(b.5) N S-24-162 446 1 06/06/2024
  22-1-143 (1)(d)(IV) N H-24-1039 127 2 04/29/2024
  22-1-143 (1)(e.5) N S-24-162 446 1 06/06/2024
  22-1-143 IP(4) A S-24-162 446 1 06/06/2024
  22-1-143 (4)(a) A S-24-162 446 1 06/06/2024
  22-1-143 (4.2) N S-24-162 446 1 06/06/2024
  22-1-143 (8) N S-24-162 446 1 06/06/2024
4 22-1-144 N H-24-1076 203 1 08/07/2024
  22-1-145 N H-24-1039 127 1 04/29/2024
4 22-1-146 N S-24-048 405 3 08/07/2024
4 22-1-147 N H-24-1164 438 1 08/07/2024
  22-2-117 (1)(b)(I) A H-24-1448 236 28 05/23/2024
5 22-2-117 (1)(b)(IX) A H-24-1039 127 3 04/29/2024
5 22-2-117 (1)(b)(IX) A H-24-1323 419 2 06/05/2024
5, 58 22-2-117 (1)(b)(X) A H-24-1039 127 3 04/29/2024
5, 58 22-2-117 (1)(b)(X) A H-24-1323 419 2 06/05/2024
3, 58 22-2-117 (1)(b)(X) A H-24-1451 354 1 06/03/2024
  22-2-117 (1)(b)(XI) N H-24-1039 127 3 04/29/2024
  22-2-117 (1)(b)(XII) N H-24-1323 419 2 06/05/2024
  22-2-117 (1)(d) A H-24-1448 236 28 05/23/2024
2, 4 22-2-127.8 N H-24-1136 460 2 08/07/2024
4 22-2-129 R H-24-1450 490 32 08/07/2024
4 22-2-139 (5) A H-24-1222 155 10 08/07/2024
4 22-2-146.6 (4)(d)(II)(A) A H-24-1450 490 33 08/07/2024
2, 4 22-2-146.8 N H-24-1446 239 2 08/07/2024
4 22-2-147 (2) A H-24-1164 438 2 08/07/2024
4 22-2-147 (3)(b) A H-24-1164 438 2 08/07/2024
4 22-2-147 (3)(c) A H-24-1164 438 2 08/07/2024
4 22-2-147 (3)(d) N H-24-1164 438 2 08/07/2024
4 22-2-147 (5.3) N H-24-1164 438 2 08/07/2024
4 22-2-147 (5.7) N H-24-1164 438 2 08/07/2024
4 22-2-147 (6) A H-24-1164 438 2 08/07/2024
4 22-2-147 (8)(d) N H-24-1164 438 2 08/07/2024
4 22-2-147 (8)(e) N H-24-1164 438 2 08/07/2024
  22-2-150 N S-24-142 481 4 06/07/2024
  22-2-310 N H-24-1063 436 2 06/05/2024
  22-2-311 N H-24-1364 238 12 05/23/2024
4 22-2-405 (3)(b) A H-24-1450 490 34 08/07/2024
2 22-2-405 (4)(b) A S-24-188 235 12 05/23/2024
  22-2-407 (3.5) N H-24-1206 18 1 03/12/2024
2 22-2-407.5 (4)(e)(IV) A S-24-188 235 13 05/23/2024
4 22-2-409 (4) A H-24-1222 155 11 08/07/2024
4 22-7-303 (2)(c) A H-24-1255 392 2 08/07/2024
4 22-7-303 (2)(d) A H-24-1255 392 2 08/07/2024
4 22-7-303 (2)(e) N H-24-1255 392 2 08/07/2024
4 22-7-304 (1)(c) A H-24-1255 392 3 08/07/2024
4 22-7-304 (1)(g) A H-24-1255 392 3 08/07/2024
4 22-7-304 (1)(h) A H-24-1255 392 3 08/07/2024
4 22-7-304 (1)(i) N H-24-1255 392 3 08/07/2024
4 22-7-306 (1) A H-24-1255 392 4 08/07/2024
2 22-7-1006.3 (1)(e) A S-24-070 408 2 06/05/2024
4 22-7-1009.7 N S-24-014 237 1 08/07/2024
4 22-9-109 IP(1) A S-24-132 106 1 08/07/2024
4 22-9-109 (1.5) N S-24-132 106 1 08/07/2024
4 22-9-109 (3) A H-24-1450 490 35 08/07/2024
4 22-10-101 A H-24-1450 490 36 08/07/2024
4 22-10-103 IP A H-24-1450 490 37 08/07/2024
4 22-10-104 (1)(b) A H-24-1450 490 38 08/07/2024
4 22-10-104 IP(1)(d) A H-24-1450 490 38 08/07/2024
  22-10-104 (4) N S-24-051 14 3 03/06/2024
4 22-10-105 (1)(b) A H-24-1450 490 39 08/07/2024
4 22-10-107 (1)(c) A H-24-1450 490 40 08/07/2024
4 22-10-107 (1)(d) A H-24-1450 490 40 08/07/2024
2 22-14-109.5 (4)(d) A S-24-188 235 16 05/23/2024
  22-14-109.5 (7.7) N H-24-1282 204 1 05/18/2024
  22-14-109.5 (8) R H-24-1282 204 1 05/18/2024
  22-14-111 (2.5) N H-24-1282 204 2 05/18/2024
4 22-20-114 (1)(c)(I) A H-24-1450 490 41 08/07/2024
  22-20-114.3 N H-24-1448 236 9 05/23/2024
2 22-20-114.5 (3)(b)(I) A S-24-188 235 14 05/23/2024
4 22-20-122 N S-24-069 407 1 08/07/2024
  22-20-123 N H-24-1063 436 1 06/05/2024
2, 4 22-25-104 (2) A H-24-1136 460 3 08/07/2024
2, 4 22-25-104 (3)(d) N H-24-1136 460 3 08/07/2024
2, 4 22-25-104 (4.5) A H-24-1136 460 3 08/07/2024
  22-30-105 IP(1) A H-24-1448 236 29 05/23/2024
  22-30-105 (1)(b) A H-24-1448 236 29 05/23/2024
  22-30-114 (1)(k) A H-24-1448 236 30 05/23/2024
  22-30-120.5 A H-24-1448 236 31 05/23/2024
  22-30-129 (7) A H-24-1448 236 32 05/23/2024
  22-30.5-103 (6.5) A H-24-1448 236 33 05/23/2024
3 22-30.5-104 (3)(b)(II) A H-24-1451 354 2 06/03/2024
  22-30.5-104 (6)(a) A H-24-1448 236 34 05/23/2024
  22-30.5-104 (6)(c)(IV) A H-24-1448 236 34 05/23/2024
5 22-30.5-104 (6)(c)(VIII) A H-24-1039 127 4 04/29/2024
5 22-30.5-104 (6)(c)(VIII) A H-24-1323 419 3 06/05/2024
5, 58 22-30.5-104 (6)(c)(IX) A H-24-1039 127 4 04/29/2024
5, 58 22-30.5-104 (6)(c)(IX) A H-24-1323 419 3 06/05/2024
3, 58 22-30.5-104 (6)(c)(IX) A H-24-1451 354 2 06/03/2024
  22-30.5-104 (6)(c)(X) N H-24-1039 127 4 04/29/2024
  22-30.5-104 (6)(c)(XI) N H-24-1323 419 3 06/05/2024
  22-30.5-112 (1)(a)(II) A H-24-1448 236 35 05/23/2024
  22-30.5-112 (2)(a.5)(II) A H-24-1448 236 35 05/23/2024
  22-30.5-112 (2)(a.5)(II.5) A H-24-1448 236 35 05/23/2024
  22-30.5-112 (2)(e)(II)(B) A H-24-1448 236 35 05/23/2024
  22-30.5-112.1 (1)(b) A H-24-1448 236 36 05/23/2024
  22-30.5-112.1 (1)(g) A H-24-1448 236 36 05/23/2024
  22-30.5-112.1 (1)(i) A H-24-1448 236 36 05/23/2024
  22-30.5-112.1 (1)(j.2) A H-24-1448 236 36 05/23/2024
4 22-30.5-404.5 N H-24-1154 206 2 08/07/2024
3 22-30.5-507 (3)(b)(II) A H-24-1451 354 3 06/03/2024
  22-30.5-507 (7)(b)(IV) A H-24-1448 236 37 05/23/2024
5 22-30.5-507 (7)(b)(VIII) A H-24-1039 127 5 04/29/2024
5 22-30.5-507 (7)(b)(VIII) A H-24-1323 419 4 06/05/2024
5, 58 22-30.5-507 (7)(b)(IX) A H-24-1039 127 5 04/29/2024
5, 58 22-30.5-507 (7)(b)(IX) A H-24-1323 419 4 06/05/2024
3, 58 22-30.5-507 (7)(b)(IX) A H-24-1451 354 3 06/03/2024
  22-30.5-507 (7)(b)(X) N H-24-1039 127 5 04/29/2024
  22-30.5-507 (7)(b)(XI) N H-24-1323 419 4 06/05/2024
  22-30.5-513 (1)(c) A H-24-1448 236 38 05/23/2024
  22-30.5-513 (1)(d.2) A H-24-1448 236 38 05/23/2024
  22-30.5-513 (1)(e) A H-24-1448 236 38 05/23/2024
  22-30.5-513 (1)(g) A H-24-1448 236 38 05/23/2024
  22-30.5-513 (2)(e)(II) A H-24-1448 236 38 05/23/2024
  22-30.5-513 (3)(b) A H-24-1448 236 38 05/23/2024
  22-30.5-513.1 (1) A H-24-1394 96 1 04/18/2024
  22-30.5-513.1 (2)(a) R H-24-1394 96 1 04/18/2024
  22-30.5-513.1 (2)(a.5)(I) A H-24-1394 96 1 04/18/2024
115 22-30.5-513.1 (2)(b) A H-24-1394 96 1 04/18/2024
115 22-30.5-513.1 (2)(b) A H-24-1448 236 39 05/23/2024
  22-30.7-107 IP(2) A H-24-1448 236 40 05/23/2024
  22-30.7-107 (2)(b) A H-24-1448 236 40 05/23/2024
  22-32-108.5 (2)(g) A H-24-1448 236 41 05/23/2024
3 22-32-109 (1)(ll)(II)(B) A H-24-1451 354 4 06/03/2024
2, 4 22-32-109.1 (1)(b) A H-24-1285 397 2 08/07/2024
3 22-32-110 (1)(k)(II)(B) A H-24-1451 354 5 06/03/2024
  22-32-119 (1)(b) A H-24-1448 236 42 05/23/2024
  22-32-120 (8)(a.2) N H-24-1206 18 2 03/12/2024
  22-32-120 (8)(a.4) N H-24-1206 18 2 03/12/2024
  22-32-141 (4)(a) A H-24-1448 236 43 05/23/2024
2 22-32-141 (4)(d)(I) A S-24-188 235 15 05/23/2024
2 22-32-141 (4)(d)(III) A S-24-188 235 15 05/23/2024
  22-32.5-108 IP(3) A H-24-1448 236 44 05/23/2024
  22-32.5-108 (3)(a) A H-24-1448 236 44 05/23/2024
  22-33-103.5 (8)(b) A H-24-1403 124 3 04/29/2024
  22-33-103.5 (8)(c) N H-24-1403 124 3 04/29/2024
  22-33-104.5 (6)(a) A H-24-1448 236 45 05/23/2024
2 22-35-103 (6)(a) A S-24-188 235 17 05/23/2024
2 22-35-104 (3) A S-24-188 235 18 05/23/2024
2 22-35-104 (5) A S-24-188 235 18 05/23/2024
  22-35-105 IP(2) A H-24-1448 236 46 05/23/2024
  22-35-105 (2)(a) A H-24-1448 236 46 05/23/2024
29 22-35-107 (6)(g) N H-24-1278 337 2 09/01/2024
29 22-35-107 (8)(a) A H-24-1278 337 2 09/01/2024
  22-35-108 IP(1)(a) A H-24-1393 74 1 04/18/2024
  22-35-108 (1)(b) A H-24-1393 74 1 04/18/2024
  22-35-108 (2)(a)(III) A H-24-1393 74 1 04/18/2024
  22-35-108 (2)(a)(V) N H-24-1393 74 1 04/18/2024
  22-35-108 (2)(a)(VI) N H-24-1393 74 1 04/18/2024
  22-35-108 (2)(c) N H-24-1393 74 1 04/18/2024
163 22-35-108 (3) A H-24-1393 74 1 04/18/2024
163 22-35-108 (3) A H-24-1448 236 47 05/23/2024
  22-35-108 (4) A H-24-1393 74 1 04/18/2024
  22-35-108 (7) N H-24-1393 74 1 04/18/2024
  22-35-108.5 (3)(a) A H-24-1448 236 48 05/23/2024
  22-35-108.5 (3)(b) A H-24-1448 236 48 05/23/2024
  22-35-108.5 (7) A S-24-135 34 7 03/22/2024
  22-35-111 (2) A H-24-1448 236 49 05/23/2024
  22-35-112 R S-24-135 34 6 03/22/2024
  22-35-115 N H-24-1364 238 1 05/23/2024
  22-35.3-102 (8) A H-24-1448 236 50 05/23/2024
2, 4 22-35.3-103 (1) A H-24-1305 283 2 08/07/2024
  22-35.3-104 (1)(a) A H-24-1448 236 51 05/23/2024
  22-35.6-103 (1) A H-24-1448 236 52 05/23/2024
3 22-38-104 (1)(d)(II)(B) A H-24-1451 354 6 06/03/2024
  22-40-102 (1.7)(a) A H-24-1448 236 53 05/23/2024
  22-40-102 (6)(a) A H-24-1448 236 53 05/23/2024
  22-41-102 IP(3)(h) A H-24-1448 236 10 05/23/2024
  22-41-102 (3)(i) N H-24-1448 236 10 05/23/2024
  22-41-102 (3)(j) N H-24-1448 236 10 05/23/2024
  22-41-102 (3)(k) N H-24-1448 236 10 05/23/2024
4 22-42-102 (2)(a)(VIII) A H-24-1154 206 3 08/07/2024
4 22-42-102 (2)(a)(VIII.5) N H-24-1154 206 3 08/07/2024
  22-43.7-104 (2)(d) A H-24-1448 236 11 05/23/2024
  22-43.7-110 (2)(a)(VII) A H-24-1448 236 12 05/23/2024
  22-43.7-110 (2)(a)(VIII) A H-24-1448 236 12 05/23/2024
  22-43.7-110 (2)(a)(IX) N H-24-1448 236 12 05/23/2024
  22-43.7-111 (1)(f) N H-24-1448 236 13 05/23/2024
  22-43.7-201 (4)(a)(II)(A) A H-24-1448 236 54 05/23/2024
2 22-45-103 (1)(k)(III) N S-24-188 235 2 05/23/2024
  22-52-107 A H-24-1448 236 55 05/23/2024
  22-54-101 A H-24-1448 236 1 05/23/2024
  22-54-102 A H-24-1448 236 2 05/23/2024
  22-54-103 (1.3) A H-24-1448 236 3 05/23/2024
  22-54-103 (1.5)(a)(V) R H-24-1448 236 3 05/23/2024
  22-54-103 (1.5)(b) R H-24-1448 236 3 05/23/2024
  22-54-103 (1.5)(c)(II)(A) R H-24-1448 236 3 05/23/2024
  22-54-103 (5.5)(a) R H-24-1448 236 3 05/23/2024
2 22-54-103 (5.7) N S-24-188 235 3 05/23/2024
  22-54-103 (6) A H-24-1448 236 3 05/23/2024
  22-54-103 (6.5) A H-24-1448 236 3 05/23/2024
  22-54-103 (7) R H-24-1448 236 3 05/23/2024
2 22-54-103 (8.3) N S-24-188 235 3 05/23/2024
  22-54-103 (8.5)(a)(II) A H-24-1448 236 3 05/23/2024
  22-54-103 (8.5)(b) A H-24-1448 236 3 05/23/2024
  22-54-103 (10)(a)(II) A H-24-1448 236 3 05/23/2024
  22-54-103 (10)(a)(III.5) A H-24-1448 236 3 05/23/2024
  22-54-103 (10)(a)(V) A H-24-1448 236 3 05/23/2024
  22-54-103 IP(10)(b)(I) A H-24-1448 236 3 05/23/2024
  22-54-103 (10)(d) A H-24-1448 236 3 05/23/2024
  22-54-103 (10)(f) A H-24-1448 236 3 05/23/2024
  22-54-103 (10)(g) R H-24-1448 236 3 05/23/2024
  22-54-103 IP(10)(h)(I) A H-24-1448 236 3 05/23/2024
4 22-54-103 (10)(i) N S-24-048 405 4 08/07/2024
  22-54-103 (10.5)(b) A H-24-1448 236 3 05/23/2024
2 22-54-103 (10.7) N S-24-188 235 3 05/23/2024
  22-54-103 (10.8) N H-24-1448 236 3 05/23/2024
  22-54-103 (14) A H-24-1448 236 3 05/23/2024
  22-54-103 (15) A H-24-1448 236 3 05/23/2024
  22-54-103.1 N H-24-1448 236 4 05/23/2024
  22-54-103.2 N H-24-1448 236 5 05/23/2024
  22-54-103.3 N H-24-1448 236 6 05/23/2024
  22-54-103.5 N H-24-1448 236 7 05/23/2024
  22-54-104 (1) A H-24-1448 236 8 05/23/2024
2 22-54-104 (2)(a)(X) A S-24-188 235 4 05/23/2024
  22-54-104 (4.7)(a) A H-24-1393 74 3 07/01/2024
  22-54-104 (4.7)(b) A H-24-1393 74 2 04/18/2024
  22-54-104 (4.7)(c) R H-24-1393 74 2 04/18/2024
  22-54-104 (4.7)(d) N H-24-1393 74 2 04/18/2024
2 22-54-104 (4.9) N S-24-188 235 4 05/23/2024
2 22-54-104 (5)(a)(XXXI) N S-24-188 235 4 05/23/2024
  22-54-104 (5)(b)(IV) A H-24-1448 236 8 05/23/2024
2 22-54-104 (5)(g)(I)(N) A H-24-1207 19 2 03/08/2024
2 22-54-104 (5.5) N S-24-188 235 4 05/23/2024
  22-54-104 (7) N H-24-1448 236 8 05/23/2024
  22-54-104 (8) N H-24-1448 236 8 05/23/2024
  22-54-104.1 R H-24-1448 236 14 05/23/2024
  22-54-104.2 (1) A H-24-1448 236 15 05/23/2024
  22-54-104.2 (2) R H-24-1448 236 15 05/23/2024
2 22-54-104.2 (5) N S-24-188 235 5 05/23/2024
  22-54-104.3 (2.7)(a) A H-24-1448 236 16 05/23/2024
  22-54-104.3 IP(2.7)(d)(I) A H-24-1448 236 16 05/23/2024
  22-54-104.3 (2.7)(d)(I)(A) A H-24-1448 236 16 05/23/2024
  22-54-104.3 (3) R H-24-1448 236 16 05/23/2024
  22-54-104.3 (5) R H-24-1448 236 16 05/23/2024
2 22-54-104.6 IP(3) A S-24-188 235 6 05/23/2024
  22-54-105 (3)(a) A H-24-1448 236 17 05/23/2024
  22-54-105 (3)(b) R H-24-1448 236 17 05/23/2024
  22-54-106 (2) R H-24-1448 236 18 05/23/2024
  22-54-106 (2.1)(c)(I) A H-24-1448 236 18 05/23/2024
  22-54-106 (2.1)(e)(II) A H-24-1448 236 18 05/23/2024
2 22-54-107 (5) A S-24-188 235 7 05/23/2024
  22-54-107.7 N H-24-1448 236 19 05/23/2024
2, 140 22-54-107.9 (1)(l) A S-24-188 235 8 05/23/2024
  22-54-107.9 (1)(l) R H-24-1448 236 20 05/23/2024
2, 116 22-54-107.9 (3)(b)(II) A S-24-188 235 8 05/23/2024
116 22-54-107.9 (3)(b)(II) A H-24-1448 236 20 05/23/2024
  22-54-107.9 (3.5) N H-24-1448 236 20 05/23/2024
2 22-54-107.9 (7)(a.5) N S-24-188 235 8 05/23/2024
  22-54-108 (1) A H-24-1448 236 21 05/23/2024
  22-54-108 (2) A H-24-1448 236 21 05/23/2024
  22-54-108 (3)(a) A H-24-1448 236 21 05/23/2024
  22-54-108 (3)(b)(I) A H-24-1448 236 21 05/23/2024
  22-54-108 (3)(b)(II) A H-24-1448 236 21 05/23/2024
  22-54-108 (3)(b)(III) A H-24-1448 236 21 05/23/2024
  22-54-108 (3)(b)(IV)(A) A H-24-1448 236 21 05/23/2024
  22-54-108 (3)(b)(IV)(B) A H-24-1448 236 21 05/23/2024
  22-54-108 (3)(b)(VI) N H-24-1448 236 21 05/23/2024
2, 116 22-54-108 (5)(b) A S-24-188 235 9 05/23/2024
116 22-54-108 (5)(b) A H-24-1448 236 21 05/23/2024
  22-54-108.5 (1)(a) A H-24-1448 236 22 05/23/2024
  22-54-108.5 (1)(b) A H-24-1448 236 22 05/23/2024
  22-54-108.5 (1)(e) A H-24-1448 236 22 05/23/2024
  22-54-108.7 (1)(a) A H-24-1448 236 23 05/23/2024
4 22-54-109 (2) A H-24-1222 155 12 08/07/2024
4 22-54-112 (3) A H-24-1172 387 4 08/07/2024
  22-54-115 IP(1) A S-24-017 49 1 04/04/2024
  22-54-115 (1.1) N S-24-017 49 1 04/04/2024
  22-54-115 (1.2) N S-24-017 49 1 04/04/2024
2 22-54-117 IP(1)(a) A S-24-188 235 10 05/23/2024
2 22-54-117 (1)(a)(VIII) A S-24-188 235 10 05/23/2024
  22-54-122 (2) A H-24-1448 236 24 05/23/2024
  22-54-123 (2)(a.2) N H-24-1206 18 3 03/12/2024
  22-54-123 (2)(a.4) N H-24-1206 18 3 03/12/2024
  22-54-123.5 (2)(b)(I.2) N H-24-1206 18 4 03/12/2024
  22-54-123.5 (2)(b)(I.4) N H-24-1206 18 4 03/12/2024
  22-54-124 (4)(c) A S-24-017 49 2 04/04/2024
  22-54-124 (4)(d) N S-24-017 49 2 04/04/2024
  22-54-129 (1)(g) A H-24-1448 236 25 05/23/2024
2, 4 22-54-138 (3)(a) A S-24-143 162 4 08/07/2024
2 22-54-146 (1) A S-24-188 235 11 05/23/2024
2 22-54-146 (2) A S-24-188 235 11 05/23/2024
2 22-54-147 N H-24-1389 94 2 04/18/2024
  22-55-102 (14) A H-24-1448 236 56 05/23/2024
  22-55-102 (18) A H-24-1448 236 56 05/23/2024
  22-55-104 IP(3) A H-24-1448 236 57 05/23/2024
  22-55-106 (2) A H-24-1448 236 58 05/23/2024
  22-60.5-106 (2) A H-24-1087 112 1 04/19/2024
2 22-60.5-106 (3) A H-24-1376 349 5 06/03/2024
2 22-60.5-110 IP(3)(b) A H-24-1376 349 6 06/03/2024
  22-60.5-112 (1)(b) A H-24-1391 95 1 04/18/2024
4 22-60.5-121 IP(8)(b) A H-24-1450 490 42 08/07/2024
  22-60.5-205 (2)(d)(III) N H-24-1087 112 2 04/19/2024
3 22-63-206 (1)(b)(II) A H-24-1451 354 7 06/03/2024
  22-80-102 (3)(c) N H-24-1206 18 5 03/12/2024
  22-82.9-202 (3) N H-24-1390 133 1 04/29/2024
  22-82.9-203 (11.5) N H-24-1390 133 2 04/29/2024
  22-82.9-204 (2) A H-24-1390 133 3 04/29/2024
  22-82.9-204 (3) A H-24-1390 133 3 04/29/2024
  22-82.9-204 (4)(b) A H-24-1390 133 3 04/29/2024
  22-82.9-204 (6) N H-24-1390 133 3 04/29/2024
  22-82.9-204 (7) N H-24-1390 133 3 04/29/2024
  22-82.9-205 (5) A H-24-1390 133 4 04/29/2024
  22-82.9-206 (2) A H-24-1390 133 5 04/29/2024
  22-82.9-207 (4) A H-24-1390 133 6 04/29/2024
  22-82.9-208 (2) A H-24-1390 133 7 04/29/2024
  22-82.9-209 A H-24-1390 133 8 04/29/2024
  22-82.9-210 (8) N H-24-1390 133 9 04/29/2024
  22-82.9-210 (9) N H-24-1390 133 9 04/29/2024
  22-82.9-211 N H-24-1390 133 10 04/29/2024
  22-82.9-3 (entire part 3) N H-24-1390 133 11 04/29/2024
4 22-105.5- (entire article 105.5) N H-24-1331 234 1 08/07/2024
4 22-108- (entire article 108) N H-24-1216 314 1 08/07/2024
TITLE 23            
Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date
  23-1-105.5 (2)(a) A S-24-135 34 8 03/22/2024
  23-1-108 (1.5)(f)(II) A S-24-135 34 9 03/22/2024
  23-1-108.5 (1) A S-24-164 202 2 05/18/2024
  23-1-108.5 (2)(b) R S-24-164 202 2 05/18/2024
  23-1-108.5 (2)(c) A S-24-164 202 2 05/18/2024
  23-1-108.5 (2)(d) R S-24-164 202 2 05/18/2024
  23-1-108.5 (2)(e) N S-24-164 202 2 05/18/2024
  23-1-108.5 (2)(f) N S-24-164 202 2 05/18/2024
  23-1-108.5 (2)(g) N S-24-164 202 2 05/18/2024
  23-1-108.5 (3)(a) A S-24-164 202 2 05/18/2024
  23-1-108.5 (3)(b) A S-24-164 202 2 05/18/2024
  23-1-108.5 (3)(c) A S-24-164 202 2 05/18/2024
  23-1-108.5 (3)(d.5) N S-24-164 202 2 05/18/2024
  23-1-108.5 (3)(d.7) N S-24-164 202 2 05/18/2024
  23-1-108.5 (4) A S-24-164 202 2 05/18/2024
  23-1-108.5 (5) A S-24-164 202 2 05/18/2024
  23-1-108.5 (6.5) N S-24-164 202 2 05/18/2024
  23-1-108.5 (8) N S-24-164 202 2 05/18/2024
  23-1-113 (1.5)(b) A S-24-135 34 10 03/22/2024
  23-1-113 IP(9)(a) A S-24-135 34 10 03/22/2024
  23-1-113 (10) A S-24-135 34 10 03/22/2024
  23-1-113 IP(10.5)(a) A S-24-135 34 10 03/22/2024
  23-1-113 (10.5)(c) A S-24-135 34 10 03/22/2024
  23-1-113.3 (4)(a) R S-24-135 34 11 03/22/2024
  23-1-113.3 (5.5) A S-24-135 34 11 03/22/2024
  23-1-113.5 (4)(d)(I)(A) A S-24-135 34 12 03/22/2024
4 23-1-119.5 A H-24-1450 490 43 08/07/2024
  23-1-125 IP(1) A S-24-164 202 1 05/18/2024
  23-1-125 (1)(h) N S-24-164 202 1 05/18/2024
  23-1-125 (1)(i) N S-24-164 202 1 05/18/2024
  23-1-125 (1)(j) N S-24-164 202 1 05/18/2024
  23-1-125 (1)(k) N S-24-164 202 1 05/18/2024
  23-1-125 (1.5) N S-24-164 202 1 05/18/2024
  23-1-125 (6) N S-24-164 202 1 05/18/2024
  23-1-134 IP(3) A S-24-135 34 13 03/22/2024
  23-1-137.7 N H-24-1323 419 5 06/05/2024
  23-1-140 (3) N H-24-1364 238 13 05/23/2024
77 23-1-141 (7) A H-24-1210 17 1 03/06/2024
77 23-1-141 (7) A H-24-1364 238 15 05/23/2024
4 23-1-143 N H-24-1082 61 1 08/07/2024
  23-3.1-306.5 (1)(a)(V) A S-24-226 311 1 05/31/2024
  23-3.1-306.5 IP(1)(b) A S-24-226 311 1 05/31/2024
  23-3.1-306.5 (2)(a) A S-24-226 311 1 05/31/2024
  23-3.1-306.5 (2)(a.5) N S-24-226 311 1 01/01/2025
  23-3.1-306.5 (2)(a.7) N S-24-226 311 1 05/31/2024
  23-3.1-306.5 (2)(b.5) N S-24-226 311 1 05/31/2024
  23-3.1-306.5 (2)(c.5) N S-24-226 311 1 01/01/2025
  23-3.1-306.5 (2)(d) A S-24-226 311 1 01/01/2025
  23-3.1-306.5 (3) A S-24-226 311 1 05/31/2024
  23-3.1-306.5 (4)(a) A S-24-226 311 1 05/31/2024
  23-3.1-306.5 (4)(b) A S-24-226 311 1 05/31/2024
  23-3.1-306.5 IP(4)(c) A S-24-226 311 1 05/31/2024
  23-3.1-306.5 (4)(c)(I) A S-24-226 311 1 05/31/2024
  23-3.1-306.5 (4)(c)(II) A S-24-226 311 1 05/31/2024
  23-3.1-306.5 (5) A S-24-226 311 1 05/31/2024
  23-3.1-306.5 IP(6) A S-24-226 311 1 05/31/2024
  23-3.1-306.5 (6)(a) A S-24-226 311 1 05/31/2024
  23-3.1-306.5 (6)(b)(II) A S-24-226 311 1 05/31/2024
  23-3.1-306.5 (6)(b)(III) R S-24-226 311 1 05/31/2024
  23-3.1-306.5 (6)(b)(IV) A S-24-226 311 1 05/31/2024
  23-3.1-306.5 (6)(b)(V) A S-24-226 311 1 05/31/2024
  23-3.1-306.5 (6)(b)(VI) R S-24-226 311 1 05/31/2024
  23-3.1-306.5 (6)(b)(VII) N S-24-226 311 1 05/31/2024
  23-3.1-306.5 (6)(c) N S-24-226 311 1 05/31/2024
  23-3.1-306.5 (6)(d) N S-24-226 311 1 05/31/2024
  23-3.1-306.5 (7) A S-24-226 311 1 05/31/2024
  23-3.1-306.5 (8)(c) A S-24-226 311 1 05/31/2024
  23-3.3-103 (1.5) N H-24-1404 79 1 04/18/2024
  23-3.3-103 (21) N H-24-1405 80 2 04/18/2024
  23-3.3-103 (22) N H-24-1465 257 5 05/24/2024
  23-3.3-1006 (1)(a.5) N H-24-1465 257 4 05/24/2024
  23-3.3-1006 (1)(b.5) N H-24-1465 257 4 05/24/2024
  23-3.3-1006 (2) A H-24-1465 257 4 05/24/2024
  23-3.3-1006 IP(3)(a) A H-24-1465 257 4 05/24/2024
  23-3.3-1006 IP(4)(a) A H-24-1465 257 4 05/24/2024
  23-3.3-1006 (6.5) N H-24-1465 257 4 05/24/2024
4 23-3.3-1303 (1)(b) A H-24-1392 157 1 08/07/2024
4 23-3.3-1305 (4) N H-24-1392 157 2 08/07/2024
4 23-3.3-1305 (5) N H-24-1392 157 2 08/07/2024
  23-3.3-1401 (1)(d)(I) A H-24-1403 124 2 04/29/2024
  23-3.3-1401 (2)(a) A H-24-1403 124 2 04/29/2024
  23-3.3-1401 (5)(a) A H-24-1403 124 2 04/29/2024
  23-3.3-15 (entire part 15) N H-24-1403 124 1 04/29/2024
2 23-3.9-302 (4)(b) A H-24-1466 429 14 06/05/2024
  23-3.9-302 (5) N H-24-1290 398 1 06/04/2024
2 23-3.9-303 (4)(b) A H-24-1466 429 15 06/05/2024
2 23-3.9-402 (1)(b) A H-24-1466 429 16 06/05/2024
  23-4.5-103 (5)(e) A S-24-135 34 14 03/22/2024
4 23-5-145.5 (3)(a) A H-24-1450 490 44 08/07/2024
2, 4 23-5-145.6 (4.5) N S-24-143 162 5 08/07/2024
2, 4 23-5-145.8 N S-24-143 162 2 08/07/2024
  23-5-150 N S-24-164 202 3 05/18/2024
  23-8-102 (8) N H-24-1364 238 14 05/23/2024
  23-15-102 (1)(a) A H-24-1295 268 1 05/28/2024
  23-15-103 (8.5)(a)(I)(A) A H-24-1295 268 2 05/28/2024
  23-15-103 (8.5)(a)(II)(A) A H-24-1295 268 2 05/28/2024
  23-15-107 IP(1) A H-24-1295 268 3 05/28/2024
  23-15-107 (1)(v) A H-24-1295 268 3 05/28/2024
  23-15-107 (1)(w) N H-24-1295 268 3 05/28/2024
  23-15-107 (2) A H-24-1295 268 3 05/28/2024
  23-18-202 (1)(d) N H-24-1424 87 1 04/18/2024
2, 4 23-18-202 (5)(c)(III) A H-24-1305 283 3 08/07/2024
2, 4 23-18-202 (5)(f) A H-24-1305 283 3 08/07/2024
  23-18-304 (1)(c)(II)(B) A H-24-1405 80 1 04/18/2024
2, 4 23-18-308 (1)(m) N S-24-104 299 4 08/07/2024
4 23-18-308 (1)(n) N S-24-048 405 2 08/07/2024
4 23-20-3 (entire part 3) N S-24-048 405 1 08/07/2024
15 23-21-501 (1)(f) A H-24-1399 76 12 07/01/2025
15 23-21-504 (1) A H-24-1399 76 13 07/01/2025
92 23-21-802 (1)(h)(I) A H-24-1045 470 12 08/07/2024
92 23-21-803 (5.3) N H-24-1045 470 13 08/07/2024
92 23-21-804 (1) A H-24-1045 470 14 08/07/2024
92 23-21-804 (2) A H-24-1045 470 14 08/07/2024
92 23-21-805 (2)(a)(V) A H-24-1045 470 15 08/07/2024
92 23-21-805 (2)(a)(VI) A H-24-1045 470 15 08/07/2024
92 23-21-805 (2)(a)(VII) N H-24-1045 470 15 08/07/2024
92 23-21-806 IP(1) A H-24-1045 470 16 08/07/2024
92 23-21-806 (1)(c) A H-24-1045 470 16 08/07/2024
92 23-21-806 (1)(d) R H-24-1045 470 16 08/07/2024
92 23-21-806 (2)(b) A H-24-1045 470 16 08/07/2024
92 23-21-806 (2)(d) A H-24-1045 470 16 08/07/2024
92 23-21-806 (3) A H-24-1045 470 16 08/07/2024
92 23-21-807 IP(1) A H-24-1045 470 17 08/07/2024
92 23-21-807 (1)(c) A H-24-1045 470 17 08/07/2024
92 23-21-807 (1)(e) N H-24-1045 470 17 08/07/2024
92 23-21-807 IP(2) A H-24-1045 470 17 08/07/2024
92 23-21-807 (2)(c) R H-24-1045 470 17 08/07/2024
92 23-21-807 (2)(e) A H-24-1045 470 17 08/07/2024
92 23-21-807 (2)(g) A H-24-1045 470 17 08/07/2024
4 23-23-103 (1)(d) A H-24-1222 155 13 08/07/2024
4 23-23-107 (1) A H-24-1222 155 14 08/07/2024
  23-31-313 (9.5)(c) A H-24-1024 210 1 05/20/2024
  23-31-313 (9.5)(e)(I) A H-24-1024 210 1 05/20/2024
  23-31-313 (9.5)(f) N H-24-1024 210 1 05/20/2024
4 23-31-313 (11) R H-24-1450 490 45 08/07/2024
4 23-31-321 N H-24-1006 209 1 08/07/2024
2 23-40-107 N H-24-1231 143 4 05/01/2024
  23-60-111 (1) A S-24-051 14 1 03/06/2024
  23-64-104 (1)(p) A S-24-198 452 5 06/06/2024
  23-64-104 (1)(q) A S-24-198 452 5 06/06/2024
  23-64-104 (1)(r) N S-24-198 452 5 06/06/2024
4 23-64-116 (1) A H-24-1333 270 3 08/07/2024
4 23-64-133 A H-24-1333 270 2 08/07/2024
  23-70-103 (3) A S-24-164 202 4 05/18/2024
4 23-71-102 (1)(a) A H-24-1450 490 46 08/07/2024
4 23-71-110 (3) A H-24-1131 65 1 08/07/2024